Verify Power LED is on

Check switch and incoming 

power at 120VAC.

Turn off wire path  

slide switch and cycle power.

Check field LED for 

alternating GREEN/RED colors 

every 0.5 seconds.

Start 50/60Hz test in Decoder 

Diagnostic section of central 

control software.

Verify output voltage on each 

wire path is 33± VAC.

Check incoming 24VAC.

Replace LDI/SDI

Confirm System Status is OK 

in central control software.

Troubleshoot as 

Necessary

Proceed to Field 

Troubleshooting

Replace LDI/SDI

Replace LDI or SDI

Turn on one field 

wire path at a 

time to find wire 

path with short 

condition. LED 

will be solid when 
shorted wire path 

is activated.

Disconnect 

field wires and 

recheck voltage.

Reconnect field wire. Compare 

expected and actual “at rest” current 

draw in Decoder Diagnostic section of 

central control software.

Run ON/OFF Test in Decoder 

Diagnostic Section of 

Central Control Software 

and Proceed to Field 

Troubleshooting

Recommended Rain Bird

®

 

Troubleshooting Procedure for 

“No Control Over  

Field Decoders”

OKAY

OKAY

OKAY

OKAY

OKAY

OKAY

Check Transformer Fuse

Replace Fuse

Replace Transformer

BAD

BLOwN

GOOD

OKAY

Symptoms: 

No control over field 

decoders and zeros in course log.

OFF

SOLID LED

SOLID LED

OKAY

BAD

LOw

LOw

If replacing transformer, 
connect 24VAC wires to 
terminal screws before 
plugging transformer in.

3

Содержание FD-101

Страница 1: ...llation requires up to 80 percent less wire than conventional controller systems Electronic components are completely encapsulated to protect against the elements And system expansion is easy simply s...

Страница 2: ...mine the total calculated current draw of the wire path 3 To calculate the static current draw of an entire interface add up all calculated wire path current draws that are connected to the interface...

Страница 3: ...d wire path with short condition LED will be solid when shorted wire path is activated Disconnect field wires and recheck voltage Reconnect field wire Compare expected and actual at rest current draw...

Страница 4: ...ION DETAILS Large and small Decoder Interface Locating a bad decoder using a Clamp meter SENSOR 1 e g Rain Sensor SENSOR 2 Not Shown e g Alarm Sensor To System Ground Connect to 24 VAC transformer Dur...

Страница 5: ...t Run ON OFF Test in Decoder Diagnostics to Validate System Operation Repeat to narrow down location of wire path short Choose point halfway between measurement point and end of wire path Break critic...

Страница 6: ...determine exact location of broken wire or partial connection Bad Splice Turn on first wire path Compare expected actual at rest current draw to expected current draw in Decoder Diagnostic window in c...

Страница 7: ...fy at rest current draw matches expected current draw Run ON OFF test to validate system operation At LDI disconnect wire with lower draw and choose point halfway to end of wire path Measure draw in c...

Страница 8: ...Corporation 6991 East Southpoint Road Tucson AZ 85756 U S A Phone 800 984 2255 520 741 6100 Fax 520 741 6522 Email rbgolf rainbird com Technical Service and Support 800 RAINBIRD U S and Canada only R...

Отзывы: