background image

Troubleshooting

Decoders

General Information

Calculate expected “At Rest” current  
draw on each wire path and each 
LDI or SDI interface.

•  FD-101 = 0.5 mA 
•  FD-102 = 0.5 mA 
•  FD-202 = 1.0 mA 
•  FD-401 = 1.0 mA 
•  FD-601 = 1.0 mA

Prior to troubleshooting when using 
a clamp meter, make sure you know 
the static current draw of the wire 
path or sections of wire path you will 
be troubleshooting. (1) To calculate 
the static current draw at an individual 
wire path section, add the number of 
decoders that are downstream from the 
test point, and multiply it by the current 
draw of each decoder to determine 
the total calculated current draw of 
the wire section after the test point. (2) 
To calculate the static current draw of 
an entire wire path, add the number 
of decoders on the entire wire path, 
and multiply it by the current draw of 
each decoder to determine the total 
calculated current draw of the wire path. 
(3) To calculate the static current draw of 
an entire interface, add up all calculated  
wire path current draws that are 
connected to the interface.

NOTE: If the wire path has been looped, 
you must break the loop in order to 
properly troubleshoot current draw  
using a clampmeter.

 (see Locating A Bad Decoder on page 4).

Example:

Blue WIRe

•  100 FD-101 x 0.5 mA = 50 mA
•  25 FD-202 x 1.0 mA = 25 mA
•  10 FD-401 and FD-601 = 10 mA

•  Total Blue Wire current = 85 mA

ReD WIRe

•  80 FD-102 x 0.5 mA = 40 mA
•  20 FD-202 x 1.0 mA = 20 mA
•  15 FD-401 and FD-601 = 15 mA

•  Total Red Wire current = 75 mA

•  Total Current for lDI or SDI = 85 + 

75 = 160 mA

Tool list

•  Spare Decoders 
•  Clamp Meter (current specifications are 

available by calling 1-866-GSP-XPRT)  

•  Digital Multi-Meter 
•  Direct Bury Wire Splice Kits 
•  Maxi Wire Strippers 
•  Wire Strippers 
•  Linesman Pliers 
•  Extra Maxi Wire 
•  Updated “As-Built” drawing 

(“As Built” 

should show wire path colors, decoder locations, 
expected current draw per wire path and expected 
current draw per LDI/SDI.)

2

Содержание FD-101

Страница 1: ...llation requires up to 80 percent less wire than conventional controller systems Electronic components are completely encapsulated to protect against the elements And system expansion is easy simply s...

Страница 2: ...mine the total calculated current draw of the wire path 3 To calculate the static current draw of an entire interface add up all calculated wire path current draws that are connected to the interface...

Страница 3: ...d wire path with short condition LED will be solid when shorted wire path is activated Disconnect field wires and recheck voltage Reconnect field wire Compare expected and actual at rest current draw...

Страница 4: ...ION DETAILS Large and small Decoder Interface Locating a bad decoder using a Clamp meter SENSOR 1 e g Rain Sensor SENSOR 2 Not Shown e g Alarm Sensor To System Ground Connect to 24 VAC transformer Dur...

Страница 5: ...t Run ON OFF Test in Decoder Diagnostics to Validate System Operation Repeat to narrow down location of wire path short Choose point halfway between measurement point and end of wire path Break critic...

Страница 6: ...determine exact location of broken wire or partial connection Bad Splice Turn on first wire path Compare expected actual at rest current draw to expected current draw in Decoder Diagnostic window in c...

Страница 7: ...fy at rest current draw matches expected current draw Run ON OFF test to validate system operation At LDI disconnect wire with lower draw and choose point halfway to end of wire path Measure draw in c...

Страница 8: ...Corporation 6991 East Southpoint Road Tucson AZ 85756 U S A Phone 800 984 2255 520 741 6100 Fax 520 741 6522 Email rbgolf rainbird com Technical Service and Support 800 RAINBIRD U S and Canada only R...

Отзывы: