background image

NORmAL

START

Open Decoder Diagnostics 

in central control software. 

Compare actual “at rest” current 

draw to expected current draw.

Turn off all LDI field output wire 

path slide switches.

Run ON/OFF test in Decoder 

Diagnostic window of central 

control software to locate 

last passing decoder and first 

failing decoder.

Activate 50/60Hz mode.  

Use clampmeter to find  

broken wire.

Break critical path wire loop (if 

present). Choose point halfway out 

on wire path. Using clampmeter, 

check RED and BLACK wires 

individually. Compare each value 

to expected current draw.

Repeat to determine exact 

location of broken wire or partial 

connection (Bad Splice).

Turn on first wire path. Compare 

expected actual “at rest” current 

draw to expected current draw 

in Decoder Diagnostic window in 

central control software.

Compare stations and areas that 

pass with stations and areas that 

do not pass ON/OFF test.

Problem Unlikely a 

Broken wire Path

Problem Unlikely a 

Broken wire Path

Recommended Rain Bird

®

 

Troubleshooting Procedure for 

“Suspected Broken  

Wire Path”

LOw 

No “As Built”

LOw

GO TO FIELD

LOw 

Good “As Built”

CURRENT = 0

NORmAL

NORmAL

LOw

Symptoms: 

Zeros in course log.  

No response on parts of wire path 

or partial connection (Bad Splice).

Repeat for each 

wire path

Break is between 

measurement point 

and end of wire path.

Break is between 

central control and 

measurement point.

6

Содержание FD-101

Страница 1: ...llation requires up to 80 percent less wire than conventional controller systems Electronic components are completely encapsulated to protect against the elements And system expansion is easy simply s...

Страница 2: ...mine the total calculated current draw of the wire path 3 To calculate the static current draw of an entire interface add up all calculated wire path current draws that are connected to the interface...

Страница 3: ...d wire path with short condition LED will be solid when shorted wire path is activated Disconnect field wires and recheck voltage Reconnect field wire Compare expected and actual at rest current draw...

Страница 4: ...ION DETAILS Large and small Decoder Interface Locating a bad decoder using a Clamp meter SENSOR 1 e g Rain Sensor SENSOR 2 Not Shown e g Alarm Sensor To System Ground Connect to 24 VAC transformer Dur...

Страница 5: ...t Run ON OFF Test in Decoder Diagnostics to Validate System Operation Repeat to narrow down location of wire path short Choose point halfway between measurement point and end of wire path Break critic...

Страница 6: ...determine exact location of broken wire or partial connection Bad Splice Turn on first wire path Compare expected actual at rest current draw to expected current draw in Decoder Diagnostic window in c...

Страница 7: ...fy at rest current draw matches expected current draw Run ON OFF test to validate system operation At LDI disconnect wire with lower draw and choose point halfway to end of wire path Measure draw in c...

Страница 8: ...Corporation 6991 East Southpoint Road Tucson AZ 85756 U S A Phone 800 984 2255 520 741 6100 Fax 520 741 6522 Email rbgolf rainbird com Technical Service and Support 800 RAINBIRD U S and Canada only R...

Отзывы: