User Manual 

Single Phase Hybrid Inverter 

 

 

 

 
 

GHYPER-EN-A65-V10-2109

Summary of Contents for GHyper 3000

Page 1: ...User Manual Single Phase Hybrid Inverter GHYPER EN A65 V10 2109 ...

Page 2: ......

Page 3: ...1 Packing List 12 4 2 Storage 14 5 Mounting Installation 15 5 1 Requirements for Mounting 15 5 2 Mounting Instructions 17 6 Electrical Connection 21 6 1 Wiring Diagram 22 6 2 Overview of Connection Area 23 6 3 PV Connection 24 6 4 Grid Connection 26 6 5 EPS Connection 27 6 6 Battery Connection 28 6 7 Smart Meter Connection 30 6 8 Parallel Connection 31 6 9 Wi Fi Stick Connection 32 6 10 DRM Connec...

Page 4: ...9 Technical Data 45 9 1 Hyper 3000 3680 5000 45 9 2 Certificates and Grid Regulations 47 ...

Page 5: ...formed by professional electrical personnel who has obtained the license from local authorities 1 3 Symbols Safety instructions will be highlighted with the following symbols These important instructions must be followed during installation operation and maintenance of the inverter Symbol Description Indicates a hazard with a high level of risk that if not avoided will result in death or serious i...

Page 6: ...the safety regulations of electrical system working process of PV power generation system and standards of local power grid The technician must read through this User Manual carefully before any operations 2 2 Inverter Protection Danger to life from electric shock Do not open the enclosure at any time Unauthorized opening will void warranty and in most cases terminate the operating license Do not ...

Page 7: ...d to inverter As soon as receiving the inverter please check if it is damaged during its transportation If yes please contact your dealer immediately Only qualified personnel can change the country settings Adequate ventilation must be provided for inverter installation location Mount the inverter in vertical direction and ensure that no object is put on the heat sink affecting the cooling 2 3 Bat...

Page 8: ... the inverter is dual power supplied Electrical operators must wear proper personal protective equipment helmet insulated footwear gloves etc Before touching the DC cables operator must use a measuring device to ensure that the cable is voltage free The operator must follow all warnings on the PV strings and in its manual All electrical connections must be in accordance with local and national sta...

Page 9: ...r could be exported to the grid Battery shall discharge to support loads when PV power is insufficient If battery power is not sufficient the system will take power from grid to support loads The hybrid inverter must only be connected with lithium battery approved by GRWOCOL to prevent personal injury and property damage and to ensure long term operation of the product 3 1 View of the Inverter Vie...

Page 10: ...ive black for negative 7 PV connection area 8 COM port Communication port for BMS Cable Smart Meter Cable Parallel Cable 9 EPS output System will supply emergency power from PV or Battery to supply some important loads that cannot be powered off 10 GRID connection area AC input and AC output port Depend on different working modes can supply power by the grid or feed into the grid comply with local...

Page 11: ...n Risk of Danger Caution Risk of Electric Shock Caution Hot Surface Refer to the corresponding instructions 5min Danger to life due to high voltage Cut off all power and wait at least 5 minutes before any work is carried out on the inverter RCM mark of conformity WEEE Mark Do not dispose of the inverter together with household waste ...

Page 12: ...8 3 2 SystemDiagram DC AC Communication Mobile APP Grid Li ion Battery Internet Billing Meter PV Array Hybrid Inverter Router Loads Smart Meter ...

Page 13: ...power will be supplied by the grid When the battery SOC is below the DischargeEndSOC Grid value or the battery is empty the inverter will stop working and local loads will be supplied from the grid Thanks to the on grid operation the switch from battery power PV power and grid power is automatic and seamless When grid fails When grid fails the inverter will automatically disconnect from grid and o...

Page 14: ... charged firstly from PV and secondly from grid at the max allowable current When the battery is above the DischargeEndSOC Grid value it will be charged by excess PV energy and will discharge if the PV power is not enough to support the loads When grid or diesel generator is not available When there is enough energy stored in the battery the EPS port will export power to support local loads firstl...

Page 15: ...nect too many of this kind of load to avoid frequent system shutdown and restart 3 3 4 Declaration for backup loads Hyper series inverter is able to supply a continuous 5000VA output max 5500VA for 10s on EPS side Inverter will shut down under full loading with high ambient temperature if grid is absent Accepted loads as below Inductive Load Max 1 5KVA for single inductive load max 2 5KVA for tota...

Page 16: ...st Make sure the inverter is intact during transportation Before installation please inspect the unit If there is any visible damage or missing please contact your local distributor immediately A B C D E F G H I J K L M N O P Scope of delivery ...

Page 17: ...Fixing Inverter Bracket H 1 User Manual I 1 BMS Cable 0 2m J 1 Smart Meter Cable 5m K 2 Power Cable Red for positive black for negative 0 4m L 8 Connection terminals for PV and AC cables M 2 PE terminal for internal enclosure grounding N 1 PE terminal for external enclosure grounding O 2 Crystal heads for Parallel connection cable P 4 Fixed Screws for Fixing Battery Bracket M5 ...

Page 18: ...s between 0 and 95 non condensing In case of stacking storage the number of stacking layers should never exceed the limit marked on the outer side of the packing case Do not position the inverter at a front tilt excessive back tilt or side tilt or upside down Conduct periodic inspection during storage Replace the packing materials immediately if any rodent bites are found Ensure that qualified per...

Page 19: ...rious wounds In the case of poor ventilation the system performance may compromise 5 1 1 Location Requirements No direct sunlight No rain exposure No snow lay up Direct sunlight Rain exposure Snow lay up Select an optimal mounting location for safe operation long service life and expected performance Please AVOIDE direct sunlight rain exposure snow laying up during installation and operation And D...

Page 20: ...el Above 2000m the inverter output will be de rated Not in environment of precipitation or humidity 95 The ambient temperature in the range of 20 C to 60 C 4 F to 140 F The slope of the wall should be within 5 Do not install the inverter on a wall made of flammable materials or gypsum boards or similar materials with weak sound insulation 5 1 3 Angle and Space Requirements Never install the invert...

Page 21: ...ry Metal studs of sufficient gauge Step 2 Take out the Brackets Open the inverter packing box and take out the wall mounting brackets Before taking out the inverter bracket you need to unscrew the screws between the inverter and the inverter bracket Step 3 Anchor the Mounting Bracket Plan and measure distance between system components and determine whether cables will be routed into the system fro...

Page 22: ... driller Drill bit φ12 make sure the holes are deep enough at least 65mm Step 5 Secure the Battery bracket on the wall a Insert the expansion bolts M12 4 into the holes and secure with a hammer b Fasten the nut with a wrench to expand the bolt c Remove the nut spring washer and flat washer and store them properly d Fix the Battery bracket with expansion bolts e Tighten the bracket using the Expans...

Page 23: ...s it s recommended to connect the battery cable firstly to avoid interference caused by insufficient space Step 7 Secure the Inverter bracket on the wall a Fix the inverter bracket to the two mounting ears on the upper part of the battery bracket b Fasten the inverter bracket to the wall with 5 expansion bolts and don t forget to lock the inverter bracket to the battery using M5 screws ...

Page 24: ...dle control box and connect the wires between Grid PV Battery and inverter Then close the cover of the middle control box after completing the wiring and tighten the screws Note Please refer to the next chapter 6 Electrical connection for wiring specifications and connection Step 10 Close the Wiring Compartments Buckle the cover of Wiring Compartments area after the electrical connections are fini...

Page 25: ...t the DC and AC circuit breakers and prevent them from inadvertent reconnection Ensure that all cables are voltage free before performing cable connection Any improper operations during cable connection can cause device damage or personal injury Only qualified personnel can perform cable connection All cables must be firmly attached undamaged properly insulated and adequately dimensioned Comply wi...

Page 26: ...22 6 1 Wiring Diagram Wiring Diagram PV1 PV1 PV2 PV2 RCD N L Smart Meter E Bar Hybrid Inverter Battery Energy Meter BATTERY PV 1 PV 2 BMS MULTI EPS GRID EPS Load General Load RCD kWh ...

Page 27: ...23 6 2 Overview of Connection Area Wire connection area of Middle control box ...

Page 28: ...ff position Otherwise please use an external PV switch to cut offthe PV connection during wiring and when necessary It s very important for system safety and efficient operation to use appropriate cable for PV module connection To reduce risk of injury please use the proper recommended cable size as below Procedure Use IEC61730 class A Rating PV modules When exposed to light PV panels will generat...

Page 29: ... Multi meter Ensure that the polarities of the DC input power cables are correct Step 2 Installing the PV Connector Check correct polarity of connection cable from PV modules and PV input connectors Then connect positive pole of connection cable to positive pole of PV circuit breaker Connect negative pole of connection cable to negative pole of PV circuit breaker ...

Page 30: ... AC cable through the cable gland and the housing Unscrew the cap on the AC port at the bottom of the middle control box insert the AC cable through the waterproof connector Remove an appropriate length of the insulation layer from the wire Fully insert the conductors to the corresponding terminal and tighten the screws Pull cables outward to check whether they are firmly installed Step 2 Installi...

Page 31: ...up loads in the event of inverterfailure Before connecting please check the following The grid voltage and frequency must be in the permissible range Procedure Step 1 Unscrew the cap on the EPS port at the bottom of the middle control box insert the EPS cable through the waterproof connector Assemble the EPS connector reference to AC connector Make sure Live Neutral PE wires are correct Be sure fo...

Page 32: ...ectors to battery power ports make sure the polarities are correct Step 2 Plug the Battery cable into the inverter Plug the other ends of power cables into inverter Please contact with your inverter vendor for detailed information If the connector from wire to battery is not assembled you need to contact with your battery vendor for detailedinformation ...

Page 33: ...one communicationport of BMS cable metercableand parallel cables It is recommended to receive the function of the inverter before wiring and install the three cables at the same time to save installation steps Procedure BMS Connector Pin Definition 1 BMS_CAN_H 2 BMS_CAN_L 3 BMS_485_A 4 GND 5 BMS_485_B 6 GND 7 NULL 8 NULL Step 1 Unscrew the cap on the COM port at the bottom of the middle control bo...

Page 34: ...ery is CAN with a RJ45 connectors Insert the RJ45 connector with water proof cap into the port marked Meter on middle control box Step 3 The wires on the other end should be stripped and connectedto the smart meter accordingly If the cable length is not enough please use the RJ45 extender in accessary box to extend the cable and install the included 1kohm resistor MULTI Connector Pin Definition 1 ...

Page 35: ...CHINT DDSU666 D Smart Meter Cable From Grid N L 3 7 8 4 1 5 6 2 N L To Inverter Loads 6 8 Parallel Connection This inverter supports 2 units in parallel please refer to the parallel user manual for specific operations 485A ...

Page 36: ...theEMS port Step 2 Insert the Wi Fi stick into the Wi Fi port and screw it tightly 6 10 DRM Connection DRM is provided to support several demand response modes by certain control signals DRM Connector Pin Definition 1 DRM1 5 2 DRM2 6 3 DRM3 7 4 DRM4 8 5 3 3V 6 DRM0 7 3 3V 8 GND ...

Page 37: ...nverter has been powered up Red LED Glowing An Error has occurred Blue LEDs Full Length SOC 75 3 Bars 75 SOC 50 2 Bars 50 SOC 25 1 Bar 25 SOC 10 No Light SOC 10 or BMS not Connected The graphical display shows the detailed information of the inverter 100 3000W 2000W 230 V 320 V 350 V 52 1V 230 V 0 W 5000 W 5000 W 10 08 08 25 11 17 123456TOTAL kWh B A C D E F G H I J K L M N O P Q R ...

Page 38: ... this label will not be shown I Total PV power generation J Default as current time when an error occurred fault code will be displayed alternatively K Default as current date when an error occurred fault code will be displayed alternatively L Direction of the grid power M Gridstatus Ifthere snogrid thislabel willnotbeshown N Grid parameters voltage and current are displayed alternatively O Direct...

Page 39: ... of grid power line and smart meter Step 2 Power on the Battery The battery icon and its parameters should be shown on the screen If the SOC of the battery is greater than 10 the blue LEDs shouldalso be turned on to indicate the SOC Step 3 Power on the PV If there s sunlight the PV icon and its parameters shouldbe shown on the screen Wait for a moment and the inverter will start a self test proced...

Page 40: ...st results Refer to LIVOLTEK APP Operation Instructionsfor details 7 3 Decommission Step1 Turn off the load Step 2 Turn off the PV Step 3 Turn off battery Step 4 Turn off the main grid switch Step 5 Waitfor atleast5 minutes after theLED and graphical display black out for the internal circuits to discharges energy Step 6 Disconnect all the power cable Step 7 Disconnect all the communication cable ...

Page 41: ...37 Inverter Commands 7 4 Settings on the APP 7 4 1 User Interface Introduction Inverter List Home Page Inverter Status Overview About Us ...

Page 42: ... free Step 2 Connect to the inverter Confirm the network information connected to the inverter before starting There are two ways to connect APP to the Inverter One is to connect to the same wireless network of the router and the other way is to connect to the Wi Fi stick s network Wi Fi name is AP_ Open the APP click the arrow on the upper right corner of home page Search the inverter ID and conn...

Page 43: ...click the BasicSettings Write in the password to enter the setting interface This canbe accessed by contacting LIVOLTEK Step 2 Set the country Check the Country make sure it is your currentlocation If it is not your current location please choose the right country and click Apply to save the setting ...

Page 44: ...40 7 4 4 Time Synchronization Procedure Step 1 Enter the Setting interface Go to Settings interface click InverterCommands Step 2 Time Synchronization Click the Time Date Sync ...

Page 45: ...Operation Periods and Parameter Enable the Scheduled Operation Set the operation period and parameters according toyour requirement One can also set the discharge period for the EPS mode if necessary Click Apply to save the setting If the scheduled periods conflict the priority of period1 is higher than period2 which is higher than period 3 and so on ...

Page 46: ...cturer Procedure Step 1 Enter the Setting interface Go to Settings interface click the BasicSettings Step 2 Max Charge Discharge Current Click the Battery BMS Setthemax charge discharge currentaccordingtorequirement which should not exceed the limitation ofbattery Click Apply to save the settings Step 3 Inverter Power Limitation Click Inverter Setthe power limitation according to yoursituation and...

Page 47: ...Bus OVP These errors will reset itself If it keeps coming and finally the Inverter is latched up please contact with your local distributor F1 00000800 AC OCPs F1 00001000 DC Component of AC Current Abnormal F1 00002000 Leakage Current Protection F1 00004000 AC OCPh F1 00008000 Rev TBD F1 00010000 EPS Voltage Abnormal Check the EPS load Unplug some to see if too much loads are connected F1 0002000...

Page 48: ...F3 00000002 BMS Internal Fault F3 00000004 BMS OVP F3 00000008 BMS UVP F3 00000010 BMS Charge OCP Check the battery for parameter settings Contact with your local battery s distributor F3 00000020 BMS Discharge OCP F3 00000040 BMS OTP F3 00000080 BMS UTP F3 00000100 Cell Imbalance F3 00000200 BMS Reversed Confirm the positive and negative polarity and re wire F3 00000400 Meter Comm Fault Please ch...

Page 49: ...ge 230V a c AC Voltage Range 180V 264V a c Rated AC Frequency 50Hz 60Hz Max AC Current to Grid Feed Back Current 13A a c 16A a c 21 7A a c Max AC Current from Grid Bypass Grid Charge 26A a c 30A a c 30A a c Max Output Overcurrent Protection 32A a c 40A a c 40A a c Power Factor Range 0 8 0 8 Total Harmonic Distortions i 3 Inrush Current Peak Duration 120A 32us Max Output Fault Current Peak Duration...

Page 50: ...95 95 Max PV to AC Efficiency 94 94 94 Protections OVP UVP YES YES YES OCP OLP YES YES YES PV Insulation Protection YES YES YES Grounding Fault Monitoring YES YES YES Grid Protection YES YES YES DC Injection Protection YES YES YES Back Feed Current Monitoring YES YES YES Residual Current Detection YES YES YES Anti islanding Protection YES YES YES General Dimensions LxHxD 415 675 145mm Weight 33kg ...

Page 51: ... 2 Certificates and Grid Regulations EMC EN61000 6 1 EN61000 6 2 EN61000 6 3 EN61000 6 4 EN61000 4 16 EN61000 4 18 EN61000 4 29 Safety IEC EN62109 1 2 IEC62040 1 Grid Regulations EN50549 IEC61727 NRS097 2 1 ...

Page 52: ...ional Technology Shenzhen Co Ltd Address 2DO5 Baoyunda R D complex building Fuhua community Xixiang street Bao an District Shenzhen China Tel 86 755 85273176 Fax 86 755 85273176 Email info growcol tech com Web www Growcol tech com ...