Installation Sequence
WinLink User and Installation Guide
Version 1.750
3-33
Installation Sequence
The following steps are required to install the WinLink system:
1.
Install the management program on the network management
station/laptop. See Installing the WinLink Management Software,
page 3-35.
2.
Mount the ODU at each site (and antenna if external antenna is
used). See Mounting the ODU, page 3-36.
3.
Connect the ODU to the IDU at both sites. See page 3-37.
4.
Connecting the Ground to the IDU, IDU-C, PoE-8, page 3-39.
5.
Connect the power. See Connecting Power to an IDU, page 3-39,
and Connecting Power to an O-PoE, page 3-40
6.
Align the ODU/antennas. See page 3-40.
7.
Run the Installation wizard from the management program. See 3-
42.
8.
Connect user equipment to the local and remote IDUs. See page 3-
45.