
Page 21
June 2023
Corporate Headquarters | T. +972.3.766.2900 | E. [email protected] | www.radwin.com
3. Installation Steps
3.1 General Order of Operations
The overall installation procedure is as follows:
1. Install the RT-A(HBS)/Hub ODU.
2. Aligning the RT-A(HBS)/Hub ODU in the direction of the RT
‐
B(HSU)/Client ODU site
using a compass or another direction tool.
3. Install the RT
‐
B(HSU)/Client ODU.
4. Align the RT
‐
B(HSU)/Client ODU using the provided software tools.
5. Recommendation: Perform a fine alignment of the RT-A(HBS)/Hub ODU.
The following checklist provides links to the detailed procedures for installing and
establishing a basic connection between ODUs.
Print this list, and place a checkmark next to each completed task.
Step
Action
Completed?
Before
deploying
at
installation
site
1.
2.
Connecting the Laptop to an ODU
3.
Configuring the ODUs for Connectivity
4.
Checking Items to be Installed
5.
Installation
6.
Installing the Standard Mounting Kit and Mounting the ODUs/Installing
the RADWIN 2000 Alpha EMB Mounting Kit and Mounting the
ODUs/Mounting Alpha Connectorized ODUs
12. Mounting and Connecting the LPUs
Содержание RW 2000 Series
Страница 5: ...Page 5 June 2023 Corporate Headquarters T 972 3 766 2900 E sales radwin com www radwin com...
Страница 80: ...Page 80 June 2023 Corporate Headquarters T 972 3 766 2900 E sales radwin com www radwin com...
Страница 84: ...Page 84 June 2023 Corporate Headquarters T 972 3 766 2900 E sales radwin com www radwin com...