
Page 31
June 2023
Corporate Headquarters | T. +972.3.766.2900 | E. [email protected] | www.radwin.com
ii. For Hub:
4. After finishing the quick setup, the home screen appears.
5. Disconnect the ODU and prepare it for deployment in the field.
3.5 Checking Items to be Installed
•
ODU + mounting kit
•
2 LPUs for each ODU (recommended)
•
PoE (if outdoor, requires mounting kit)
•
CAT
‐
5e cables
•
Grounding cables (14 AWG) for ODU, LPUs and outdoor PoEs (if used)
•
External a mounting kit (if using an external antenna for LFF or SFF
ODUs).+ Bracket (for Radwin Dish antenna with alpha/E)
•
RF cables (if using an external antenna for LFF or SFF ODUs)
Содержание RW 2000 Series
Страница 5: ...Page 5 June 2023 Corporate Headquarters T 972 3 766 2900 E sales radwin com www radwin com...
Страница 80: ...Page 80 June 2023 Corporate Headquarters T 972 3 766 2900 E sales radwin com www radwin com...
Страница 84: ...Page 84 June 2023 Corporate Headquarters T 972 3 766 2900 E sales radwin com www radwin com...