
Page 58
June 2023
Corporate Headquarters | T. +972.3.766.2900 | E. [email protected] | www.radwin.com
Lightning Protection Units (LPUs)
The design of all installations must include the appropriate addition of both ground bonding
and surge/LPUs to better protect equipment and reduce network outages.
•
RADWIN recommends using two LPUs for each ODU installation: one near the ODU
and one near the PoE.
•
Make sure the LPU is oriented with the cable glands oriented towards the bottom.
•
Mount one LPU near the ODU, and the second near the PoE:
3.10.2
Grounding the ODUs
1. Connect a ground cable to the ground connection on the ODU as shown Grounding
3.10.3
Mounting and Connecting the LPUs
1. Mount and connect the LPUs as described in Mounting and Connecting the LPUs .
Содержание RW 2000 Series
Страница 5: ...Page 5 June 2023 Corporate Headquarters T 972 3 766 2900 E sales radwin com www radwin com...
Страница 80: ...Page 80 June 2023 Corporate Headquarters T 972 3 766 2900 E sales radwin com www radwin com...
Страница 84: ...Page 84 June 2023 Corporate Headquarters T 972 3 766 2900 E sales radwin com www radwin com...