background image

Page 21 of 22

IN052   Rev. K   0613

8.    EQUIPMENT SPECIFICATION:

AIRaider™ EZ

95

 20 Amp 120 VAC System

Blower: High Flow 20000 RPM 0.21HP 800 Watt 115VAC/5.7 Amp

Pump: 1/2 HP 1100 Watt 115V/10.6 Amp Thermally Protected Submersible

Pump Controller: Pressure Switch with Pressure Regulator to reduce Pump cycling on and off.

Air Alarm: Pressure Switch with 120 VAC/0.02 Amp Buzzer

Solenoid Valves: Normally Closed Metal Housed Class F120 VAC Buna N Seal Brass Valve Body ¾” NPT.

System Voltage: 115V

Electric Supply: 20 Amp 115VAC Dedicated Circuit.

Recommended Flow: Up to 7 GPM

Radon Reduction: Up to 95%+

Water Inlet/Outlet Connections: ¾” Sharkbite to suit ¾” Pex or Copper

Air Outlet: 2” PVC Pipe Female Socket (Solvent Cement)

Air Inlet: Via Filter/Silencer

Tank: Double Wall Insulated NSF Rated for Potable Water

Tank Dimensions: 27.62 “ H x 25.17” W x 25.23” L

Tank Operating Capacity: 27 Gallons (Total Internal Volume 41 gallons)

Overall Dimensions: 36.37” H x 25.65” W x 25.71 L

Pipe: CPVC and Pex/Pex Fittings  NSF Rated for Potable Water

EQUIPMENT SPECIFICATION

1

2

3

4

5

6

7

8

Содержание AIRaider EZ95

Страница 1: ...AIRaider EZ95 Installation Instruction Manual RadonAway 3 Saber Way Ward Hill MA 01835 radonaway com IN052 Rev K 0613...

Страница 2: ...Check 3 RETESTING 4 MAINTENANCE 4 1 Six Month Service recommended 4 2 Annual Service required 5 TROUBLE SHOOTING 6 ALARM SCHEMATIC 7 BLOWER BRUSH REPLACEMENT 8 EQUIPMENT SPECIFICATION LIMITED WARRANTY...

Страница 3: ...afety 2 Installation site requirements 3 Inspection of System components 4 Qualified Technicians are necessary 5 Knowledge of all contaminants in the water 1 1 Safety Matters Safety is the most import...

Страница 4: ...he system output the AIRaider EZ95 may run dry which will cause the pump installed integrally within the AIRaider EZ95 System to automatically shutdown To prevent outflow interruptions it is strongly...

Страница 5: ...tem or the AIRaider EZ95 System Failure to remove other contaminants can reduce the effectiveness of the system and may result in system damage 1 3 Full Water Test A full Water Sample Analysis must be...

Страница 6: ...5 System in accordance with the installation instructions Check your Local and State Code and Licensing requirements Failure to follow the instructions may lead to poor system performance and or possi...

Страница 7: ...Raider EZ95 System are listed below Read all components of each step prior to beginning the actual installation 1 System Location 2 Readying the System for Installation 3 Plumbing Hook Up 4 Electrical...

Страница 8: ...ing necessary this is typically in proximity to the well tank 2 Electrical Hook up Keep in mind the need for accessibility to a 20 Amp dedicated 120VAC power supply 3 Exhaust Line Venting The location...

Страница 9: ...r level Pump float 3 Cable length tether to float normally open prevents pump dry running Vent On off float Float switch hose clamp Check valve behind pressure regulator Vent pipe hose clamps Push but...

Страница 10: ...gned for use with a pressure tank The pressure tank bladder pressure should be set per the tank manufacturers recom mendations for a pressure switch setting of 37 psi 9 An outlet pipe must be installe...

Страница 11: ...N C Blower Neon Lamp Push Button Thermostat Over Ride A B 1 2 C D E Blower Enclosure Electrical Enclosure Wiring NEZ SRT B G W B W W B B B B W W B B B R R R R W W W R RRG RRG B B W B W B B B B B B B B...

Страница 12: ...tion 4 Ensure that the red lead provided for an optional auxiliary fan remains insulated if not used The red lead is the live feed from the Aeration System to the Fan Warning Do Not connect any of the...

Страница 13: ...st be wired to the system electrical box connections as shown in the Electrical Schematic Figure 8 This will ensure that the fan operates only when required by the system The red lead is the live feed...

Страница 14: ...ystem Start Up 1 Remove cover and lid and pour cup of chlorine into the AIRaider tank This will disinfect the system Secure the lid with the screws and washers provided 2 Check that all plumbing and e...

Страница 15: ...given in Table 1 for the measured well pump output This is done by temporarily attaching a hose to the house connection of the bypass valve and adjusting the flow control valve to provide the correct...

Страница 16: ...should be followed to maintain the AIRaider Check and or clean the blower air intake filter Check and or clean any filters or strainer installed on the inlet line to the AIRaider In installations with...

Страница 17: ...f necessary Clean if necessary tank and diffusers of all mineral build up Chlorinate tank and lines by pouring cup of chlorine into the tank Check all control panel connections and electrical componen...

Страница 18: ...not illuminated Check power switch in on position circuit breaker at panel in on position Check pump float switch for proper operation Check that the pump priming orifice rear left behind pump is not...

Страница 19: ...Page 19 of 22 IN052 Rev K 0613 6 ALARM SCHEMATIC ALARM SCHEMATIC 1 2 3 4 5 6...

Страница 20: ...ve the brush holder assembly from the motor 6 Insert the new brush holder assembly making certain that brass prongs engage the electrical socket and then replace the retaining screw 7 Repeat steps 4 6...

Страница 21: ...0 VAC Buna N Seal Brass Valve Body NPT System Voltage 115V Electric Supply 20 Amp 115VAC Dedicated Circuit Recommended Flow Up to 7 GPM Radon Reduction Up to 95 Water Inlet Outlet Connections Sharkbit...

Страница 22: ...AR PURPOSE THERE ARE NO WARRANTIES WHICH EXTEND BEYOND THE DESCRIPTION ON THE FACE HEREOF THERE IS NO WARRANTY OF MERCHANTABILITY ALL OTHER WARRANTIES EXPRESSED OR WRITTEN ARE NOT VALID In order to ob...

Отзывы: