I
NSTALLATION
Options
Ball Return Installation Manual
– 612-860-010
17
Rev. Date 10/07
Connecting the Wiring
WARNING
Before wiring the Options Ball Return, all power to the unit must be switched
off at the main breaker box or serious injury could result.
CAUTION
To avoid equipment malfunction or damage, the power supply must be rated
for the appropriate voltage and current.
1.
Verify that the power to the unit and the associated pinspotters is turned
OFF
at the
main circuit breaker.
2.
Verify that the circuit voltage and current ratings correspond to those of the Ball Lift.
All Ball Lift assemblies are shipped configured for 230-volt operation and, as
necessary, must be reconfigured for 115-volt operation as described in this section.
(Reconfiguring the motor for 115-volt operation is discussed on Page 5.)
3.
Attach the flexible conduit of the power supply cable (234-001-330), which is
supplied with the Ball Lift, to the applicable distribution box. Connect the wires in
accordance with local electrical codes. For electrical systems containing a neutral
wire, such as 115-volt systems in the United States, connect the green and yellow
wire to ground, the blue wire to neutral, and the brown wire to line.
4.
Remove the cover from the Ball Lift control box, and then remove a lock nut from the
center and left grounding (earthing) lugs in the control box.
5.
Attach the power supply cable’s flexible conduit to the control box at the
“AC IN”
location shown in Figure 15.
6.
Attach the ring terminal on the green and yellow ground wire of the power supply
cable to the leftmost grounding (earthing) lug inside the control box using one of the
lock nuts that was removed in Step 4.
7.
Cut off the two spade terminals from the brown and blue power supply wires, and
strip approximately 3/8-inch of insulation from the ends of these wires.
8.
Connect the blue wire (neutral) to terminal #6 on junction block
J3
and the brown wire
(line) to terminal #1 on
J3
(see Figure 15).
9.
Strip approximately 3/8-inch of insulation from the ends of the brown and blue
blower wires (the blower wires exit the end of a ball rack’s rail assembly). Route this
cable into the control box (see Figure 15). Tighten the cable clamp to secure the
cable to the box.
!
!
Содержание Options Ball Return
Страница 2: ......
Страница 33: ...27 Options Ball Lift Drawings Parts Lists...
Страница 34: ...PARTS Options Ball Return Installation Manual 612 860 010 Rev Date 10 07 28 252 002 138 Options Ball Lift...
Страница 46: ......