Scalar i6000 Installation Guide
331
13
For more detailed test results, click the
Text
tab to view the test log generated by the LMC.
Review the test log to find marginal or failed test results, and to see troubleshooting information. To
e-mail the test log or save it as a text file, click
Send
and then specify the output location. For information
about how to interpret and save test logs, see
14
To see the results for a previous test, click
Reports
, and then click a test. The LMC saves the most
recent five test results.
15
When you are done working with the test results, click
Close
to close the result window.
If you are done performing verification tests, click
Close
to close the
Verification Tests
dialog box.
Содержание Scalar i6000
Страница 1: ...6 66881 01 A Scalar i6000 Installation Guide Installation Guide Installation Guide Installation Guide...
Страница 20: ...8 About This Guide and Your Product...
Страница 38: ...26 Installing a Stand Alone Control Module...
Страница 104: ...92 Installing a Multi Module Library...
Страница 156: ...144 Installing Cartridges...
Страница 164: ...152 Setting up Your Library for Access...
Страница 242: ...230 Configuring the Library...
Страница 304: ...292 Adding Optional Hardware eight 2 5 mm screws...
Страница 318: ...306 Adding Optional Hardware...
Страница 336: ...324 Installation Testing and Verification Figure 35 Example Test Log Output...
Страница 356: ...344 Testing and Calibrating the Digital Level...
Страница 362: ...350 LBX Board and Terminator...
Страница 380: ...368 Glossary...
Страница 384: ...372 Index...