511010 Rev. 07-01-19
Field–Replaceable Units (FRUs)
7-3
7.2
Field Upgrades
There are several RLS upgrades possible. They are listed in Table 7-2. Installing an up-
grade is essentially the same as replacing the like FRU as described in this chapter.
Name
P/N
Section
Storage Matrix Assembly RT w/ I/O RLS-85XX
510753-02-3
7.5
Storage Matrix Assembly RT w/o I/O RLS-85XX
510753-03-1
7.5
Table 7-2 RLS Field Upgrade List
7.3
Required Tools and Materials
Table 7-3 is a complete list of the tools that would be required to replace every RLS
FRU. See individual FRU sections of this chapter for the tool needed to replace just
that FRU.
Required Tools
No. 2 Phillips Screwdriver
Door key
3/32-inch Allen (Hex) Wrench
11/32-inch Open End Wrench or Nut Driver
Small Mirror (optional)
Flashlight (optional)
Table 7-3 Required Tools
7.4
Rack-Mounted Libraries
All FRUs can be replaced without having to remove the RLS from the rack. However
there needs to be sufficient access at the front and rear of the RLS for a service tech-
nician to operate.
Содержание RLS-8350
Страница 1: ...RLS 8350 85XX Series Tape Library Technical Service Manual Document No 511010 Rev 07 01 19 ...
Страница 2: ......
Страница 7: ...511010 Rev 07 01 19 v ...
Страница 14: ......
Страница 62: ......
Страница 64: ......
Страница 106: ......