26
Figure 2.5.1
1.
Setup the hardware connection before power on servers. Connect console cable,
management port cable, and iSCSI data port cables in advance.
2.
In addition, installing an iSNS server is recommended for dual controller system.
3.
Power on
P300H61 / P300H71
and
J300H61 / J300H71
(optional) first, and
then power on hosts and iSNS server.
4.
Host server is suggested to logon the target twice (both controller 1 and controller 2),
and then MPIO should be setup automatically.
Tips
iSNS server is recommended for dual controller system.
For better data service availability, all the connections among host servers, GbE switches,
and the dual controllers are recommended as redundant as below.
Содержание P300H61
Страница 27: ...27 Figure 2 5 2 The following topology is the connections for console and UPS optional Figure 2 5 3 ...
Страница 79: ...79 ...
Страница 110: ...110 Figure 5 7 1 2 ...
Страница 145: ...145 This form can be got from QSAN ftp ftp ftp qsan com tw QSAN_Support_Form doc ...
Страница 148: ...148 Figure B 1 3 Click Done Figure B 2 Figure B 3 ...
Страница 151: ...151 Figure B 8 Figure B 9 15 Click Add 16 Click Advanced ...
Страница 153: ...153 Figure B 14 22 Done the iSCSI device disconnect successfully ...
Страница 154: ...154 System information P300H61 P300H71 SW version 2 0 1 ...