25
Figure 2.4.1
1.
BBM (Battery Backup Module) supports hot pluggable. Regardless of the subsystem is
turned on or off.
2.
Remove the cover of BBM.
3.
Insert the BBM.
4.
Tighten the BBM and use screws to lock the both sides.
5.
Done.
2.5
Deployment
Please refer to the following topology and have all the connections ready.
Содержание P300H61
Страница 27: ...27 Figure 2 5 2 The following topology is the connections for console and UPS optional Figure 2 5 3 ...
Страница 79: ...79 ...
Страница 110: ...110 Figure 5 7 1 2 ...
Страница 145: ...145 This form can be got from QSAN ftp ftp ftp qsan com tw QSAN_Support_Form doc ...
Страница 148: ...148 Figure B 1 3 Click Done Figure B 2 Figure B 3 ...
Страница 151: ...151 Figure B 8 Figure B 9 15 Click Add 16 Click Advanced ...
Страница 153: ...153 Figure B 14 22 Done the iSCSI device disconnect successfully ...
Страница 154: ...154 System information P300H61 P300H71 SW version 2 0 1 ...