C
OMMISSIONING
P
ROCEDURE
84
Note: Prior to commissioning the PowerGen please verify that the Qnergy Lynx, QEC
Load-following parameters are set-up correctly, per the customer electrical load see
Table 12.11.
Note: The PowerGen is factory set and tested to Natural Gas. If application requires the use of
Propane (LPG), turn screw #3 clockwise 3 turns prior to enabling the PowerGen.
1. Verify that the customer gas pressure is within the acceptable range:
• NG, 3 – 50 PSI₂ (customer side)
• Propane, 2 – 10 PSI (customer side)
• From the FPC screen >32mbar (after internal regulator)
Figure 12-13 Blower Tuning Screws
WARNING:
Gas valve tuning should be carried out
by Qnergy-approved technicians only.
Содержание PowerGen 5650 Series
Страница 1: ...7045 102089 000 June 1 2021 Installation Operation Manual FOR A QUALIFIED INSTALLER...
Страница 8: ...iv...
Страница 12: ...iv Figure 21 9 ATS Enclosure 179 Figure 21 10 Battery Connection Schematic 181...
Страница 28: ...SYSTEM INTRODUCTION 16 Figure 3 6 P ID Diagram...
Страница 49: ...QNERGY LYNX SOFTWARE 37 Figure 6 17 FPC Configuration Tab Figure 6 18 FPC Config System Settings...
Страница 69: ...QNERGY LYNX SOFTWARE 57 Figure 6 57 FPC FEB QEC Firmware Update...
Страница 158: ...MAINTENANCE 146 Figure 17 2 Radiator and Over Flow Tank...
Страница 194: ...POWERGEN OPTIONAL FEATURE SETS 182...