QIAsymphony SP/AS Consolidated Operating Guide 12/2017
111
Defining internal controls
1.
First load the internal controls into “Slot A” of the “Sample”
drawer.
2.
Press
Define IC
in the
Integrated Run
tab. The
Sample
Preparation/Internal Controls
screen appears.
3.
Press the loaded internal control(s) to select them.
4.
If the tube type differs from the default, press the
IC Tubes
button,
and select a tube type.
5.
Select an internal control from the
Internal controls
list. The
selected internal control will be assigned to the selected loaded
internal control(s).
6.
Press
OK
.
The selected internal controls will be assigned to the selected
internal control tubes. The
Main Overview
screen appears again.
Starting an integrated run
1.
Load the QIAsymphony SP worktable.
2.
Start the integrated run by pressing
Run
.
3.
While the integrated run is being processed, load the QIAsymphony AS worktable.
Содержание QIAsymphony SP
Страница 213: ...QIAsymphony SP AS Consolidated Operating Guide 12 2017 213 This page intentionally left blank...
Страница 214: ...QIAsymphony SP AS Consolidated Operating Guide 12 2017 214 This page intentionally left blank...
Страница 216: ...QIAsymphony SP AS Consolidated Operating Guide 12 2017 216 www qiagen com...