background image

3

1 INTRODUCTION

Information for operators
Please don’t forget to register your photovoltaic installation 
at Q.CELLS to get the full extended warranty service accord-
ing to our warranty terms. Ask our Technical Customer Serv-
ice ([email protected]) for further information.
Keep  these  instructions  safe  for  the  entire  life  of  the  
module. Particularly observe chapters 3 (Safety instructions), 
6 (Troubleshooting) and 7 (cleaning and maintenance).
Please contact your plant supplier for information concern-
ing the formal requirements for solar systems. Please be sure 
to learn about directives and permit requirements from the 
responsible  local  authorities  and  energy  providers  prior  to 
installation of the solar  plant. You can only ensure econom-
ic  success  when  these  requirements  have  been  taken  into  
account. In your own interest, make sure to acquire the nec-
essary  permits  from  the  authorities  and  contracts  with  the 
energy providers. We recommend that you insure your solar 
system against natural hazards (e.g. lightning strike).

Disclaimer
These instructions are only valid for products of the Q-Cells 
SE company. Q.CELLS assumes no liability for damage re-
sulting  from  failure  to  observe  these  instructions.  Please 
note that the wiring and dimensioning of the plant, as well 
as the observance of all necessary safety regulations when 
laying out and installing the system are the responsibility of 
the installer of the plant. These instructions do not provide 
a basis for liability of Q-Cells SE. Q-Cells SE is only liable 
in the context of contractual agreements or in the context of 
accepted guarantees.It assumes no responsibility extending 
beyond the functional capability and safety of the modules. 
Please  also  observe  the  instructions  for  the  other  compo-
nents of the solar system. It may be necessary to generate  
and evaluate the statics for the entire project. If your ques-
tions  are  not  adequately  addressed  in  these  instructions, 
please first contact your system supplier. You can find more 
information at our website www.q-cells.com. 

Q.CELLS  CIGS  solar  modules  allow  you  to  directly  transform 
the unlimited energy provided by the sun into environmentally 
friendly electrical energy.
In order to be able to completely exploit the full performance 
capacity of the Q.CELLS solar modules, please read the follow-
ing instructions carefully. Failure to observe them may result in 
bodily injury and property damage. 

This manual only applies for installations in Europe. It pro-
vides information on safety precautions to be used during the 
handling and installation of Q-Cells SE CIGS solar modules 
along with technical instructions to be followed during instal-
lation, mounting, wiring and operation. This manual applies 
for the installation of the following modules:
• Q.SMART
• Q.SMART UF
• Q.SMART UF L
of generation G1.3.

Installation,  operation  and  maintenance  works  on  a  photo-
voltaic system must be carried out by qualified persons able 
to carry out the technical procedures described in this man-
ual, i.e. system, installer and maintenance personnel. If you 
do  not  possess  these  qualifications,  you  may  not  carry  out 
the work described except for cleaning (Chapter 7).

Information for installers
Ensure that the solar system is set up, expanded, modified 
and maintained in accordance with the requisite local and 
federal  laws  and  regulations,  as  well  as  with  the  generally 
recognized  electrical  and  building  codes  of  the  country  in 
which it will be operated.
Hand  over  the  installation  and  operation  manual  to  the  
respective  operator  of  the  solar  system  after  installation. 
Inform  the  operator  that  these  instructions  are  part  of  the 
product and should be kept for the entire useful life of the 
solar installation.

Applicable documents
Q.CELLS Application Note: PV*Sol Additional Power Boost
Q.CELLS Application Note: Grounding of Q.SMART Modules
Q.CELLS Clamp list for unframed Q.SMART Modules
Q.CELLS PaTransport CIGS Modules

The documents are available on www.q-cells.com.

INSTALLATION AND OPERATION MANUAL FOR CIGS SOLAR MODULES Q-CELLS SE - EUROPE

Содержание Q.SMART Series

Страница 1: ...Q SMART Installation and operation manual for Q SMART Q SMART UF Q SMART UF L Generation G1 3 CIGS SOLAR MODULES Valid for Europe...

Страница 2: ...CYCLING PAGE 16 9 CONTACT PAGE 17 10 APPENDIX APPLICATION NOTE GROUNDING PAGE 18 Technical parameters and design are subject to change The data sheets and customer information valid at the point in ti...

Страница 3: ...nstructions please first contact your system supplier You can find more information at our website www q cells com Q CELLS CIGS solar modules allow you to directly transform the unlimited energy provi...

Страница 4: ...erating Manual by Q Cells for further information on ap proved installation and use of this product Warning ElEctrical Hazard Do not disconnect under load Q SMart UF l 100 PrOdUct Field wiring Copper...

Страница 5: ...yourself to the national regulations for work safety and accident prevention Wear suitable protective clothing e g safety shoes protective gloves in order to prevent injuries Protect the modules again...

Страница 6: ...s Solar modules are not explosion proof operating equipment The modules are not suitable for mobile usage or for indoor installations Optimal solar irradiation results in a maximum energy yield For th...

Страница 7: ...ools mounting materials or solar modules can fall and injure people Block off the danger area on the ground before begin ning the assembly work Warn people near the danger area or in the building Keep...

Страница 8: ...ules may be installed in landscape or portrait format Install the module in such a way that the junction box is positioned in the upper area of the module and the wires hang downwards Ensure that the...

Страница 9: ...ted as a coordinated unit To ensure a long term stability of the solar modules Install the module according to the mounting variants and the defined clamp areas Please refer to the Q CELLS clamp list...

Страница 10: ...s edge to the first active cell is 18 5 mm Figure 3 Ensure that clamps overlap the glass edge Figure 3 10 mm to 15 mm on the top side of the module 12 16 mm on the module back side These specification...

Страница 11: ...mm Clamp height corresponding to 36 mm frame height Figure 4 Clamp depth 7 12 mm Figure 4 Clamp area clamp depth x clamp width 600 mm Clamps that comply to the local statics requirements Clamps that...

Страница 12: ...to account all working conditions and relevant technical regu lations and standards In this way you ensure that the maximum system voltage including the necessary safety supplements are not exceeded A...

Страница 13: ...commendations for Countries with Grounding Requirements apply Exception installation within 500 m of coastline The grounding recommen dations for Countries with Grounding Requirements apply COUNTRIES...

Страница 14: ...mum voltage system or b ground fault currents 50 mA don t exceed a length of time of 0 4 s are detectable and preventable with certainty A simple ground fault safety device must not be used Specificat...

Страница 15: ...lar cables and insulated compatible connectors Q SMART modules uses MC4 connectors Only use additional components which are compatible with the modules and its electrical specifications Ensure that al...

Страница 16: ...water from the module Do not use abrasive detergents or surface active agents e g soap Do not scratch dirt off This can damage the surface of the module Modules must not be covered by snow or ice for...

Страница 17: ...allee 17 21 06766 Bitterfeld Wolfen Germany TEL 49 0 3494 66 99 0 FAX 49 0 3494 66 99 199 EMAIL service q cells com WEB www q cells com Subject to change Q Cells SE Installation and operation manual C...

Отзывы: