Installation Guide / ComT 2.0: 5°, 10° and 15°
17
Code-Compliant Planning and Installation Guide V1.0 - Complying with AS/NZS1170.2-2011 AMDT 2-2016
5.5.1 Place the PV Modules on the Front and Rear Leg as shown in Figure 26. The outside edge of the frame of the PV
Modules must overlap the marking lines on the Front and Rear Legs as shown in Figure 27. The pins of the Front and
Rear legs are used for creating earthing continuity from PV modules to both legs.
Figure 23
Figure 24
Figure 25
Figure 26
Figure 27
Figure 28
Figure 29
5.4.5 Fasten all M8 bolts with the recommended
torque of 15-17N•m.
Note: Check the electrical resistance between the
ECO rail and the cable tray to ensure the bonding is
made.
5.4.6 Align and click MT-rail cable tray cover as
showed in Figure 24.
5.5.2 Fix the clamp on the Rear Leg as shown in
Figure 28. Fasten the clamps of the Front and Rear
legs till the PV Modules are properly installed as
shown in Figure 29. Recommended torques of M8
Bolt:16-20N•m
5. PV Module Installation
- Installation Instructions -