Installation Guide / ComT 2.0: 5°, 10° and 15°
16
Code-Compliant Planning and Installation Guide V1.0 - Complying with AS/NZS1170.2-2011 AMDT 2-2016
- Installation Instructions -
4. MT-rail Cable Tray Installation (optional)
The installation instruction below uses ECO Rail as
an example, the installation instruction using T-rail is
similar.
5.4.1 According to the installation plan and MT-rail
cable tray load vs. span data below, mark fixing
positions of Cable Tray on top of ECO rail.
5.4.2 Insert the Z module with bolt (EZ-Z-STBW) into
the slot hole of Cable Tray for each fixing point, as
shown in Figure 20.
5.4.3 Position the Cable Tray on the top of the ECO
Rail by installing a z module into the top channel as
shown in Figure 21. Leave z module untightened.
5.4.4 Insert the Grounding Clip (EZ-GC-ST) between
Cable Tray and ECO Rail for each fixing point, as
shown in Figure 22.
Note: when using cutter rail (mill finish ECO rail),
grounding clip is not necessary.
Figure 11
Figure 20
Figure 21
Figure 22
Load vs.span data:
LOAD PER METER
2.5m
2.0m
1.5m
1.0m
38 kg
59 kg
106 kg
239 kg