![PURSUIT OS 315 Скачать руководство пользователя страница 103](http://html1.mh-extra.com/html/pursuit/os-315/os-315_owners-manual_1628327103.webp)
OS 315
103
The air conditioner components must be properly winterized by following winterizing procedure in the air
conditioner owner’s manual.
The air conditioning, engine control system, head, and steering systems have specific lay-up
requirements. Please refer to the owner’s manuals for recommended winterizing procedures.
BILGE
Coat all metal components, wire busses, and connector plugs in the bilge with a protecting oil. It is also
important to protect all strainers, seacocks and steering components. The bilge pumps and bilge pump lines
must be completely free of water and dried out when the boat is laid up for the winter in climates where freezing
occurs. Compartments in the bilge that will not drain completely should be pumped out and then sponged
until completely free of water. Dry the hull bilge and self-bailing cockpit troughs. Water freezing in these
areas could cause damage.
HARD TOP
It is imperative that all drain holes in the legs are open and that the legs are completely free of water. Remove
the canvas and thoroughly clean and store in a safe, dry place. Remove all electronics. Coat all wire connectors
and bus bars in the helm compartment with a protecting oil.
Clean the aluminum frame with soap and water and dry thoroughly. Apply an aluminum metal protector to
the entire frame to reduce corrosion and pitting.
ALWAYS MAKE SURE THE LEG DRAIN HOLES ARE CLEAR WHEN THE BOAT IS LAID
UP FOR THE WINTER. WATER TRAPPED INSIDE THE HARDTOP, TOWER OR RADAR
ARCH LEGS COULD FREEZE AND CAUSE THE LEGS TO SPLIT.
TOWER (if installed)
It is imperative that all drain holes in the tower and hardtop legs are open and completely free of water. Tower
basket drains should be checked and clear of debris. Remove the tower sun shade, if installed, the belly band
or other upholstery and thoroughly clean and store in a safe, dry place. Remove all electronics. Coat all wire
connectors and bus bars in the helm compartment with a protecting oil. Cover the tower basket with a tarp
and secure it properly.
Clean the aluminum frame with soap and water and dry thoroughly. Apply an aluminum metal protector to
the entire frame to reduce corrosion and pitting.
COVERING FOR WINTER STORAGE
If the boat will be in outside storage, properly support a storage cover and secure it over the boat. It is best
to have a frame built over the boat to support the canvas. It should be a few inches wider than the boat so
the canvas will clear the rails and allow passage of air. If this cover is fastened too tightly there will be
inadequate ventilation and this can lead to mildew, moisture accumulation, etc. It is essential to fasten the
canvas down securely so that the winds cannot remove it or cause chafing of the hull superstructure. Do not
store the boat in a damp storage enclosure. Excessive dampness can cause electrical problems, corrosion, and
excessive mildew.
Whenever possible, do not use the bimini top or convertible top canvas in place of the winter storage cover.
The life of these canvases may be significantly shortened if exposed to harsh weather elements for long periods.
Содержание OS 315
Страница 2: ...OS 315 2 THIS PAGE WAS LEFT BLANK INTENTIONALLY...
Страница 4: ...OS 315 4 THIS PAGE WAS LEFT BLANK INTENTIONALLY...
Страница 6: ...OS 315 6 OperatorNotes...
Страница 8: ...OS 315 8 OperatorNotes...
Страница 10: ...OS 315 10 OperatorNotes...
Страница 58: ...OS 315 58 OperatorNotes...
Страница 64: ...OS 315 64 OperatorNotes...
Страница 74: ...OS 315 74 OperatorNotes...
Страница 90: ...OS 315 90 OperatorNotes...
Страница 98: ...OS 315 98 OperatorNotes...
Страница 106: ...OS 315 106 OperatorNotes...
Страница 114: ...OS 315 114 THIS PAGE WAS LEFT BLANK INTENTIONALLY...
Страница 116: ...OS 315 116 Hours Date Dealer Service Repairs MAINTENANCE LOG...
Страница 117: ...OS 315 117 Hours Date Dealer Service Repairs MAINTENANCE LOG...
Страница 118: ...OS 315 118 Hours Date Dealer Service Repairs MAINTENANCE LOG...
Страница 119: ...OS 315 119 Hours Date Dealer Service Repairs MAINTENANCE LOG...
Страница 120: ...OS 315 120 Hours Date Dealer Service Repairs MAINTENANCE LOG...
Страница 124: ...OS 315 124 THIS PAGE WAS LEFT BLANK INTENTIONALLY...
Страница 128: ...OS 315 128 THIS PAGE WAS LEFT BLANK INTENTIONALLY...