Installation
Installation Guidelines
It is recommended that the UV reactor be installed horizontally to facilitate easy replacement
of the lamp and/or quartz sleeve. In the event that you require installing it vertically please
contact Puretec first for installation recommendations.
The UV system should be installed in an easily accessible location to simplify maintenance.
NOTE:
OPERATING SPACE EQUAL TO OR GREATER THAN THE REACTOR LENGTH MUST BE
ALLOWED ON THE SIDE OF THE REACTOR (TYPICALLY ON THE SIDE WHERE THE LAMP
IS CONNECTED) TO ALLOW FOR THE LAMPS AND QUARTZ SLEEVE TO BE REMOVED OR
REPLACED.
•
Install equipment in an indoors environment.
•
The ambient temperature in the installation area should be between 10°C and 40°C with
the relative humidity less than 80%.
•
Insulate the unit from extreme temperatures.
•
Install the chamber horizontally (if mounting vertically first contact Puretec).
•
To avoid trapping air and optimal performance ensure the outlet is at the highest point.
•
Allow maintenance space around the system, including the reactor length for lamp and
quartz removal.
•
Ensure that the UV controller display and keypad on the control panel are at eye level
and easily viewable. Mount the control panel at a height from the floor as a precaution
against water flooding.
•
When mounting the control panel on the wall, ensure there is at least a 15 cm (6 inches)
of air space around the sides of the panel for sufficient cooling of the inner electronic
components. The more air space there is around the control panel the more efficient the
cooling will be.
•
The maximum cable length between the control panel and the UV reactor is 3.5 m. Plan
the location of the reactor and panel accordingly. Do not attempt to increase the length
of this wire in any way.
•
The mains supply cable to the control panel is already pre-wired. This is connected to
the control panel through one of the available inlet ports on the bottom of the panel and
is wired directly to the terminal blocks. In case a longer run of wire is required this wire
may be replaced, but ensure that the correct gauge wire is used and the connections
done in a proper manner. Refer to the electrical wiring diagram for more information.
•
Ensure that a situation does not arise where the system is running dry (without water)
or where the water is stagnant inside the system. This situation can cause the reactor to
overhead damaging the lamps, ballasts, and other electrical systems. If such a situation
may arise, provide a bleed valve so that there is always a minimum flow through the UV
reactor.