
PRONAR T679/5
SECTION 4
4.16
Unloading of the trailer is performed in the following sequence:
tractor and trailer must be placed to drive forwards on flat and hard ground,
immobilise tractor with parking brake,
FIGURE 4.2
Unloading load box with hydraulic tailgate
(1) hydraulic tailgate, (2) load box, (3) telescopic cylinder
open hydraulic tailgate (1) (standard) - Figure (4.2), using the cylinder by
operating a lever on the tractor hydraulic manifold,
when unloading the load box equipped with hinged-opening tailgate
(1), the width of the slot opening can be set using chain catches (5),
which should be secured by means of pin (6) and cotter pin (7) –
figure (4.3). If necessary, the slot size can be adjusted by changing
the length of chains (4),
using the manifold lever in the operator cab, tip the load box with a telescopic
cylinder (3),
after unloading, lower the load box and clean the floor edges,
Содержание T679/5
Страница 2: ......
Страница 6: ......
Страница 11: ...SECTION 1 BASIC INFORMATION ...
Страница 26: ...PRONAR T679 5 SECTION 1 1 16 ...
Страница 27: ...SECTION 2 SAFETY ADVICE ...
Страница 37: ...SECTION 2 PRONAR T679 5 2 11 FIGURE 2 2 Locations of information and warning decals ...
Страница 38: ...PRONAR T679 5 SECTION 2 2 12 ...
Страница 39: ...SECTION 3 DESIGN AND OPERATION ...
Страница 53: ...SECTION 4 CORRECT USE ...
Страница 72: ...PRONAR T679 5 SECTION 4 4 20 ...
Страница 73: ...SECTION 5 MAINTENANCE ...
Страница 101: ...SECTION 5 PRONAR T679 5 5 29 FIGURE 5 14 Trailer s lubrication points ...
Страница 114: ...PRONAR T679 5 SECTION 5 5 42 ...
Страница 115: ...NOTES ...
Страница 116: ... ...