![ProMinent TUC 1 Скачать руководство пользователя страница 33](http://html1.mh-extra.com/html/prominent/tuc-1/tuc-1_assembly-and-operating-instructions-manual_1616860033.webp)
Fig. 9: Inserting the drying agent
2.
Insert the drying agent immediately after opening the packaging, in order to avoid
premature saturation.
Remove the new drying agent bag (2) from the packaging and place it together
with the humidity indicator card (3) in the lower part of the DULCO
®
turb C (1). In
doing so, place the humidity indicator card (3) on the new drying agent bag (2).
3.
Place the upper part back on the lower part and tighten the four screws hand-tight.
Commissioning
33