This will rule out the pump losing oil and suffering damage.
When commissioning the unit, check whether the drive motor is rotating
correctly - check this against the arrow on the motor housing or the dia‐
gram in the chapter entitled "Electrical Installation."
Only adjust the stroke length when the pump is running. This
is easier and also better for the pump.
Check for the correct leakage at the bottom flushing connector.
Leakage for run-in packing:
10 ... 120 drops / min
Check for the correct function of the auxiliary equipment and for correct
interplay.
Checking the direction of rotation
Adjusting the stroke length
Checking for correct leakage
Auxiliary equipment
Start up
25
Содержание Sigma / 2 Basic Type SBKa
Страница 51: ...51 ...