PREPARATION FOR INITIAL LIGHTING
Allow possibility for aeration of the room. On initial kindling a characteristic sense of smell appears because of the first working warming of the painted
parts with the thermostable paint.
After the final completion of all installation works, make sure that you have read and got acquainted with all instructions in the
manual of the fireplace.
The fireplace must be connected to the electricity grid (mains) 230V- 50Hz by means of a plug and a socket type “Schuko”
and a three-wired electrical cable with an earthing (grounding)/neutral conductor. The protective neutral earthing must be
checked and confirmed with certainty.
The sensor for the room temperature must be taken out outside the body of the fireplace for correct measurement.
Check the available settings of the panel-display and, if necessary, adjustments are made. Check the reading of the
clock and the calendar.
The WHS must be filled and deaerated. The heaters (radiators) must have open valves.
It is fuelled by filling sufficient quantity of pellets in the hopper as for this purpose its lid which is in front of the display is
opened.
The auger is started beforehand to provide pellets until they appear on the grate and the auger is switched off. The
fireplace is ready to start.
OPERATION INSTRUCTIONS OF A PANEL WITH A DISPLAY
1. INTRODUCTION
The panel (see Fig.1) has a button 5 to switch ON/OFF with an icon ON/OFF, four buttons, whose functions are shown on the display close to each one of them
and an infrared sensor (IR receiver) of the remote control.
2. MAIN SCREEN
When you turn the fireplace on, on the display a screen appears with the logo of the producer on the second line, and on the first line the current room
temperature and hour appear.
After about 12 sec. the main screen appears (see Fig. 2). That means that the system is ready.
17
Fig.1 Panel