
c. Secure both the data COMM and strain gauge cables to inside of the lower right
fork weldment using the lower push-mount-cable-tie.
3. Reinstall the flywheel which also reinstalls the LPCA board, the cross member, drive
belt, and generator belt, see
"Drive Belt, Generator Belt, and Flywheel Replacement"
4. Use a new cable tie to secure the data COMM and strain gauge cables to the top of the
flywheel axle bracket near the right fork weldment. If any one of the other three cable
ties are missing, replace them.
62
5 Replacement Procedures
Data COMM Cable Replacement
Содержание Spinner Chrono
Страница 1: ...Service Manual SBK800 16 SPINNER CHRONO POWER SPINNER CLIMB INDOOR CYCLES ...
Страница 16: ... 9 ...
Страница 110: ...6 Secure pedal with the pedal mounting bolt using an 8 mm hex key torque to 33 ft lb 45 N m 103 ...
Страница 136: ...Error Log Error Log Go to Error Log on page 134 129 ...
Страница 147: ...140 6 Troubleshooting System Troubleshooting Procedures ...
Страница 150: ...Exploded View Diagram Refer to the servicer partners Precor Connect website to view the most current inform ation 143 ...
Страница 152: ...145 ...