
pedaling and verify that the voltage remains ≥ 5.8 vdc. If the battery voltage is low, start
pedaling faster than 55 rpm to charge the battery until the non-pedaling voltage remains
at ≥ 6 vdc (a new battery may need to be charged.).
4. Replace the front and then rear belt guard covers, see
.
5. Verify the bike operation per
"Operation Verification Checklist" on page 7
and return to
service.
.See Also
"Replacement Procedures" on page 28
33
Содержание Spinner Chrono
Страница 1: ...Service Manual SBK800 16 SPINNER CHRONO POWER SPINNER CLIMB INDOOR CYCLES ...
Страница 16: ... 9 ...
Страница 110: ...6 Secure pedal with the pedal mounting bolt using an 8 mm hex key torque to 33 ft lb 45 N m 103 ...
Страница 136: ...Error Log Error Log Go to Error Log on page 134 129 ...
Страница 147: ...140 6 Troubleshooting System Troubleshooting Procedures ...
Страница 150: ...Exploded View Diagram Refer to the servicer partners Precor Connect website to view the most current inform ation 143 ...
Страница 152: ...145 ...