RBK 815 Recumbent Cycle
Page 6
Section Two - Preventive Maintenance
Preventive maintenance measures are either scheduled or unscheduled. Scheduled
preventive maintenance activities are included here so that you are aware of
preventive measures performed on a regular basis.
Regular Preventive Maintenance (Owner)
Cleanliness of the cycle and its operating environment will keep maintenance
problems and service calls to a minimum. Precor recommends that you perform the
following preventive maintenance schedule.
After Each Use
•
Turn off and, unplug the power adapter (if equipped) from the bicycle.
•
Wipe down the covers, handlebars, seat and pedals with a damp cloth.
Daily Maintenance
Clean the bicycle’s frame, covers, seat and pedals using a water damped cloth. Wipe
the surface of the electronic console with a damp sponge or soft cloth. Dry with a
clean towel.
Weekly Maintenance
•
Clean underneath the bicycle, following these steps:
1.Turn off the bicycle with the on/off switch, then unplug it from the power
adapter (if equipped).
2.Place the bicycle on its side.
Note:
Place a drop cloth under the bicycle to protect the flooring and to ensure that the
cycle handrail is not scratched or damaged.
3.Vacuum the rug or damp mop the floor.
4.Make sure that the floor is dry before returning the bicycle to an upright
position.
Содержание RBK 815
Страница 23: ...RBK 815 Recumbent Cycle Page 23 Diagram 6 1 Lower PCA RBK 815 TP19 TP20 J2 M6 M7 J4 M1 M2 M3 M4 M5 ...
Страница 31: ...RBK 815 Recumbent Cycle Page 31 replace the heart rate PCA to handlebar wire harness ...
Страница 40: ...RBK 815 Recumbent Cycle Page 40 14 Replace the covers per Procedure 7 1 ...
Страница 59: ...RBK 815 Recumbent Cycle Page 59 Block Diagram 8 2 RBK 815 ...