RBK 815 Recumbent Cycle
Page 44
Procedure 7.8 - Replacing the Secondary Sheave
1.
Remove the top, rear, left and right covers per procedure 7.1.
2.
Loosen, but do not remove the idler pulley mounting nut.
3.
Remove tension from the primary belt by turning the primary belt tension
adjustment bolt counter-clockwise. See Diagram 7.4.
4.
Remove the primary belt.
5.
Insert a 1/4 inch allen wrench into the primary pulley, the allen wrench will keep
the secondary axle from turning and allow the secondary sheave to be removed.
6.
While holding the secondary axle with a 3/8 inch allen wrench, use the 20030-119
sheave removal tool and a 1/2 inch drive socket wrench to remove the secondary
sheave. See Diagram 7.10.
Diagram 7.10 - Secondary Sheave Removal
7.
Thread the replacement sheave onto the secondary axle assembly. Using the
allen wrench, 20030-119 sheave tool and socket wrench securely tighten the
secondary sheave.
8.
Replace the primary belt and tension the primary belt per Procedure 5.1.
9.
Torque the idler pulley mounting bolt to 120 inch pounds (10 foot pounds).
10. Replace the covers per Procedure 7.1.
20030-119
Sheave Tool
Содержание RBK 815
Страница 23: ...RBK 815 Recumbent Cycle Page 23 Diagram 6 1 Lower PCA RBK 815 TP19 TP20 J2 M6 M7 J4 M1 M2 M3 M4 M5 ...
Страница 31: ...RBK 815 Recumbent Cycle Page 31 replace the heart rate PCA to handlebar wire harness ...
Страница 40: ...RBK 815 Recumbent Cycle Page 40 14 Replace the covers per Procedure 7 1 ...
Страница 59: ...RBK 815 Recumbent Cycle Page 59 Block Diagram 8 2 RBK 815 ...