© Precor Incorporated, Unauthorized Reproduction and Distribution Prohibited by Law
Page 145
Weekly Maintenance
♦
Vacuum underneath the AMT, following these steps:
1.
Unplug the optional external power supply (when equipped) from
the AC outlet
2.
Remove the platform at the rear of the AMT.
3.
Carefully lift the rear of the AMT and move it to a temporary
location.
4.
Vacuum the rug or damp mop the floor.
5.
Make sure that the floor is dry before returning the AMT to its
original position and replacing the platform.
♦
Re-level the AMT to ensure that the two leveling feet are in contact
with the floor.
♦
Thoroughly test the AMT per,
Checking the AMT Operation
(on page 125),
including heart rate.
♦
Cardio Theater cord management must be observed.
Quarterly Maintenance
1.
Remove the side covers per,
Cover Replacement
(on page 152)
procedure.
2.
Check the belt alignment and tension as in
Inspection and
Adjustment Procedures
(on page 127).
3.
Clean the inside of the AMT.
4.
Inspect fasteners for proper tightness and torque.
5.
Check for excessive noise during vertical and horizontal
operation.
6.
Replace the side covers.
7.
Re-level the AMT to ensure that the two leveling "feet" are in
contact with the floor.
Содержание AMT 823
Страница 2: ......
Страница 61: ...Precor Incorporated Unauthorized Reproduction and Distribution Prohibited by Law Page 59...
Страница 81: ...Precor Incorporated Unauthorized Reproduction and Distribution Prohibited by Law Page 79...
Страница 107: ...Precor Incorporated Unauthorized Reproduction and Distribution Prohibited by Law Page 105...
Страница 199: ...Precor Incorporated Unauthorized Reproduction and Distribution Prohibited by Law Page 197...
Страница 377: ...Precor Incorporated Unauthorized Reproduction and Distribution Prohibited by Law Page 375 P30 AMT 11 835 Block Diagram...
Страница 379: ...rfJ R BK BR Bl 0 d I w l 0 1 LO iftMotor...
Страница 380: ......
Страница 382: ......