20 - 80 kVA parallel UPS systems
User’s and Installation Manual
1018390
Revision C
11
4. Instructions and preventive maintenance
4.1 General
Proper provision must be made for transportation and handling because of heavy weight and
high energy stored within batteries. See technical specifications for dimensions and weights
of the UPS modules.
4.2 Unpacking and incoming inspection
Unpack the equipment and remove the shipping and packing materials. The shipping and
packing materials should be stored for further investigation if damage has occurred during
the transportation.
The equipment must be inspected for shipping damage. A claim must be filed immediately if
visible damages can be noticed. Proceed as follows to file the claim for a shipment damage:
•
Inform the carrier about the damage within 7 days of receipt of the equipment.
•
Check and verify that the shipment is complete against the packing list.
The installation may proceed if there are no damages or discrepancies. UPS system is also
thoroughly inspected and tested at the factory.
Figure 4.
Removing the UPS module from the shipping pallet.
Содержание 9305 HS Series
Страница 1: ...User s and Installation Manual 20 80 kVA parallel UPS systems...
Страница 2: ......