3 Installation
27
While hoisting, keep balance and avoid collision with walls or other objects. In case of severe
weather conditions, such as heavy rain, heavy fog, strong wind, etc., the hoisting operation should be
stopped.
3.4.2 Unpacking and Checking
Determine the unpacking site in advance. Normally, the unpacking site should be as close to
installation position as possible.
The inverter has been completely tested and strictly inspected before leaving the factory, but damage
may still occur during transporting, so a detailed inspection is required after arrival.
Inspect the inverter's appearance for shipping damage, if any shipping damage is found, report it
to the carrier immediately.
Check if the types of the accessories are complete and correct. If there is any discrepancy, take
notes and contact the distributor immediately.
After unpacking, if the inverter will be stored for a long time, it's recommended to pack the inverter
with original plastic package.
----End
3.5 Inverter Installation
The inverter can be installed on the wall or metal bracket via equipped installation holder.
3.5.1 Bracket Installation
Step 1
Use the four M4*10 combination bolts in accessories to fix the installation holder with the joint lever,
as shown in Figure3-11.