![background image](http://html1.mh-extra.com/html/power-solid/1100vpvk/1100vpvk_user-manual_1587726013.webp)
String PV Grid-tied Inverter PSiO-W3#1100VPVK Series
(100000-125000)
User Manual
1 Safety Description
5
1.1.8 Measurement Under Operation
There exists high voltage in the device. If touching device accidently, it may cause electric shock. So,
when perform measurement under operation, it must take protection measure(such as wear insulated
gloves, etc.)
The measuring device must meet the following requirements:
The range and operation requirements of measuring device meets the site requirements;
The connections for measuring device should be correct and standard to avoid arcing.
1.2 Operator Requirements
The operation and wiring for inverter should be performed by qualified person, which is to ensure
that the electrical connection meets the related standards.
The professional technicist must meet the following requirements:
Be trained strictly and understand all safety announcements and master correct operations.
Fully familiar with the structure and working principle of the whole PV grid-tied generation
system.
Know well about the related standards of local country and district.
Содержание 1100VPVK
Страница 1: ......
Страница 2: ......
Страница 27: ...String PV Grid tied Inverter PSiO W3 1100VPVK Series 100000 125000 User Manual 3 Installation 19 Tools ...
Страница 85: ......