![background image](http://html1.mh-extra.com/html/power-solid/1100vpvk/1100vpvk_user-manual_1587726052.webp)
3 Installation
String PV Grid-tied Inverter PSiO-W3#1100VPVK Series
(100000-125000)
User Manual
44
Figure3-33
AC cable entry requirements (unit: mm)
When leaving the factory, outlet end of the cable seal ring is in a sealed status. Before connecting,
puncture it by tool.
Please connect the AC output wire according to the relevant requirements of different countries.
Step 3
Tighten the externally forced cable fixing head of the AC terminal clockwise, using a fireproof mud
cable gap.
----End
3.6.5 Internal Grounding Connection
Loosen the external forced cable fixing head of the inner grounding terminal, lead the grounding wire
go through the external forced cable fixing head, use a wire stripper to strip the grounding wire and
crimp it to the grounding terminal, and then connect it to the inner grounding bar, as shown in
Figure3-34.
Содержание 1100VPVK
Страница 1: ......
Страница 2: ......
Страница 27: ...String PV Grid tied Inverter PSiO W3 1100VPVK Series 100000 125000 User Manual 3 Installation 19 Tools ...
Страница 85: ......