![background image](http://html1.mh-extra.com/html/power-solid/1100vpvk/1100vpvk_user-manual_1587726042.webp)
3 Installation
String PV Grid-tied Inverter PSiO-W3#1100VPVK Series
(100000-125000)
User Manual
34
Figure3-22
Expansion bolt installation diagram
Step 5
Install the installation holder. Fix the installation holder to the expansion bolts, put on flat washers,
spring washers and nuts, and then tighten the nuts clockwise with a wrench, as shown in Figure3-23.
Figure3-23
Fix the installation holder
Step 6
Lift the inverter to the installation holder, make sure that the mounting ears of the inverter and the
groove of the installation holder fit well, and then slowly hang the inverter to the installation holder,
as shown in Figure3-24.
Содержание 1100VPVK
Страница 1: ......
Страница 2: ......
Страница 27: ...String PV Grid tied Inverter PSiO W3 1100VPVK Series 100000 125000 User Manual 3 Installation 19 Tools ...
Страница 85: ......