![background image](http://html1.mh-extra.com/html/power-solid/1100vpvk/1100vpvk_user-manual_1587726029.webp)
String PV Grid-tied Inverter PSiO-W3#1100VPVK Series
(100000-125000)
User Manual
3 Installation
21
Figure3-2
Installation environment requirements
As the operation of inverter will produce noise pollution, avoid installing them near residential
areas as far as possible.
Choose the best installation location for the inverter, which plays a very important role in its safe
operation, service life, performance guarantee, etc. Therefore, it is recommended to choose a place
that can avoid direct sunlight, rain, and snow. As shown in Figure3-3.
Figure3-3
Recommended installation location
3.3.2 Installation Clearance
Keep a clearance of at least 800mm from the left side and right side of the inverter to other
objects, keep at least 600mm from the top of the inverter to ceiling and at least 450mm from the
bottom of the inverter to ground, which is good for heat dissipation or maintenance, as shown in
Figure3-4.
Содержание 1100VPVK
Страница 1: ......
Страница 2: ......
Страница 27: ...String PV Grid tied Inverter PSiO W3 1100VPVK Series 100000 125000 User Manual 3 Installation 19 Tools ...
Страница 85: ......