Installation and operator’s manual
Page 5 of 65
PVI-2000-OUTD-AU Rev.: 1.0)
GENERAL
During inverter operation, some internal parts can be energised, in some cases, internal
parts can move or rotate and some surfaces can be hot.
Unauthorised removal of the necessary protections, improper use, incorrect installation
or incorrect operation may lead to serious damage to people and objects.
All transport, installation and start-up, as well as maintenance operations, shall be
carried out by skilled and trained personnel (all national regulations on accidents
prevention and electrical safety shall be complied with!!!).
Only qualified and trained people have skills for the assembling, start-up and operation
of the product, as well as the necessary requirements and qualifications to perform
such operations.
INSTALLATION
All equipment shall be installed according to the instructions and specifications
mentioned in the corresponding documents.
In particular, during transport and handling, parts shall not be bent and/or the
insulation distances shall not be changed. There should be no contact between
electronic parts and connection terminals.
Electrical parts must not be mechanically damaged or destroyed (potential health risk).
ELECTRICAL CONNECTION
The Aurora inverter should be installed incompliance with all prevailing local and
national regulations
Electrical connections shall be carried out in accordance with the applicable
regulations, such as conductor sizing, over-current protection devices and grounding
connection.