Installation and operator’s manual
Page 45 of 65
PVI-2000-OUTD-AU Rev.: 1.0)
9
Third screen: measured insulation resistance
9
Fourth screen: Output power and Voltage Input from the photovoltaic array
9
Fifth screen: Total energy exported to the grid (E-Total) and total operating time
(h-Total, that is time during which the unit was active). Both data are measured
since the unit was first operated.
9
Sixth screen: Time during which the unit exported energy to the grid (Timegrid)
and number of times that unit connected to the grid (Numgrid).
Riso MOhm
Pac ## W
Vin ## V
E-Total ## KWh
h-Total ## h
Timegrid hh:mm:ss
Numgrid ##