Installation and operator’s manual
Page 18 of 65
PVI-2000-OUTD-AU Rev.: 1.0)
3
INSTALLATION
WARNING
: The electrical installation of AURORA must be made in
accordance with the local and national electrical standards and regulations.
WARNING
: The connection of AURORA to the electrical distribution grid
must be performed only after receiving authorization from the utility that
operates the grid.
3.1
Package inspection
NOTE:
The distributor presented your AURORA to the delivering carrier
securely packed and in perfect conditions. Upon acceptance of the package
from the distributor, the delivering carrier assumes responsibility for its safe
arrival to you. Despite of the attention paid by carrier in handling it,
sometimes the package and its contents might be damaged.
Please, carry out the following checks:
¾
Examine the shipping box for any visible damage: punctures, dents or any other
signs of possible internal damage;
¾
Describe any damage or shortage on the receiving documents and have the
carrier sign their full name;
¾
Open the shipping box and inspect the contents for internal damage. While
unpacking, be careful not to discard any equipment, parts or manuals. If any
damage is detected, call the delivering carrier to determine the appropriate action.
They may require an inspection. Save all shipping material for the inspector to
see!