Operation and installation manual
Page 4 of 82
(PVI-10.0/12.5-OUTD-xx Rev:1.2)
IMPORTANT SAFETY INFORMATION AND SAFETY STANDARD
FOREWORD
¾
The installation of Aurora must be performed in full compliance with national and
local standards and regulations.
¾
AURORA features no spare parts.
For any maintenance or repair please contact the nearest authorized repair center.
Please contact your reseller if you need to know the nearest authorized repair
center.
¾
Read and understand all the instructions contained in this manual and become
familiar with the safety symbols in the relevant paragraphs before you install and
commission the equipment.
¾
The connection to the distribution grid must be done only after receiving approval
from the distribution utility as required by national and state interconnection
regulations, and can be done only by qualified personnel.
¾
Keep the whole surface of the photovoltaic panel covered with material opaque to
solar radiation before connecting panel to equipment; this will ensure that no
dangerous high voltage is present at AURORA connection cables.
GENERAL
During inverter operation, some parts could be live, some not properly insulated and,
in some cases, some parts can move or rotate, or some surfaces may be hot.
Unauthorized removal of the necessary protections, improper use, wrong installation
or wrong operation may lead to serious damage to people and objects.
Transport, handling, installation, start-up and maintenance must be performed by
qualified and trained personnel (all accident prevention rules in force in the user's
country must be observed! ! !).
According to these basic safety rules, qualified and trained people have skills for the
assembling, start-up and operation of the product, as well as the necessary
requirements and qualifications to perform such operations.
Содержание AURORA PVI-10.0/12.5-OUT-xx
Страница 38: ...Operation and installation manual Page 38 of 82 PVI 10 0 12 5 OUTD xx Rev 1 2 Fig 20 Data Transmission Options...
Страница 80: ...Operation and installation manual Page 80 of 82 PVI 10 0 12 5 OUTD xx Rev 1 2 CERTIFICATE OF CONFORMITY...
Страница 81: ...Operation and installation manual Page 81 of 82 PVI 10 0 12 5 OUTD xx Rev 1 2...
Страница 82: ...Operation and installation manual Page 82 of 82 PVI 10 0 12 5 OUTD xx Rev 1 2...