STEP 35: ROOF PEAK INSTALLATION
1: PLACE THE ROOF PEAK ASSEMBLY ON TOP OF THE ROOF SUPPORTS.
2: MEASURE ACROSS THE ROOF SUPPORTS AT THE TOP OF THE CORNER POSTS. MAKE THIS DIM
A. MEASURE ACROSS THE ROOF SUPPORTS NEAR THE ROOF PEAK. MAKE THIS DIM B. DIM B
SHOULD MATCH DIM A. THIS WILL MAKE THE ROOF SUPPORTS PARALLEL TO EACH OTHER. DUE
TO WOOD MILLING VARIATIONS THE HOLES WILL EITHER BE CENTERED ON THE ROOF SUPPORTS
OR OFF OF CENTER. SUBTRACT DIM A FROM 54-1/4" AND THEN DIVIDE THIS NUMBER BY 2. THIS
WILL GIVE YOU THE OVERHANG FOR EACH SIDE. USE THE OVERHANG NUMBER ON EACH SIDE
TO KEEP YOUR ROOF SUPPORTS PARALLEL.
3: FASTEN THE ROOF PEAK ASSEMBLY TO THE ROOF SUPPORTS WITH #8 X 1-1/2" WOOD
SCREWS.
ROOF SUPPORT
ROOF PEAK ASSEMBLY
AT THE PEAK OF THE ROOF.
TOP OF ROOF SUPPORT
ROOF SUPPORT
EXAMPLE: 54-1/4" MINUS 50-1/4" EQUALS 4".
4" DIVIDED BY 2 EQUALS 2" OVERHANG PER SIDE.
4
OVERHANG
DIM B
50 " EXAMPLE DIMENSION
DIM A
1
54 14 " ROOF STARTER LENGTH
OVERHANG
CORNER POSTS
BOTTOM OF ROOF SUPPORT
ATTACHED TO THE CORNER
POST.
#8 X 1-1/2"
WOOD SCREW
CORNER POST
ROOF SUPPORT
ROOF PEAK ASSEMBLY
63
Содержание 2500-1
Страница 6: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 8: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 11: ...Model 2507W BOXES 2500 1 2500 2 2507 Slide Box REV 3 1 2018 ...