STEP 24: MOUNT SWING BEAM TO FORT
AN EXTRA PERSON IS NEEDED FOR THIS STEP.
1: HAVE ONE PERSON WALK THE FREE END OF THE SWING BEAM TO THE SWING BEAM MOUNT ON THE FORT FROM
INSIDE THE FORT WHILE THE OTHER PERSON CARRIES THE LEGS.
2: LINE UP THE PILOT HOLE ON THE END OF THE SWING BEAM WITH THE MIDDLE HOLE ON THE SWING
BEAM PLATE OVER THE SWING BEAM MOUNT.
3: FASTEN THE SWING BEAM TO THE SWING BEAM PLATE AND SWING BEAM MOUNT USING A 3/8" X 9" CARRIAGE
BOLT WITH TORQUE WASHER ON TOP AND A 3/8" LOCK NUT AND WASHER ON THE BOTTOM. PLACE GREEN BOLT
CAPS OVER EXPOSED THREADS AFTER SECURING.
4: SQUARE THE SWING BEAM TO THE SWING BEAM MOUNT. DRILL A 3/16" PILOT HOLE THROUGH THE HOLE IN THE
SWING BEAM PLATE. FASTEN THE SWING BEAM TO THE SWING BEAM PLATE FROM UNDERNEATH WITH A 3/8" X 3-
1/2" LAG SCREW AND A 3/8" WASHER.
3/8" X 9" CARRIAGE BOLT
TORQUE WASHER
3/8" WASHER
3/8" LOCK NUT
BOLT CAP
3/8" WASHER
3/8" X 3-1/2"
HOLE THROUGH THE HOLE
IN THE PLATE 3" DEEP.
LAG SCREW
BEAM
MOUNT
SWING BEAM
SQUARE SWING BEAM
TO SWING BEAM MOUNT
AND THEN PREDRILL A 3/16"
SWING
SWING BEAM PLATE
52
Содержание 2500-1
Страница 6: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 8: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 11: ...Model 2507W BOXES 2500 1 2500 2 2507 Slide Box REV 3 1 2018 ...