Start Up
34
Installation and operating manual: PLATINUM Inverter 13000 TL, 16000 TL, 19000 TL, 22000 TL
Version 05/2010
Mat. No. 737 576-AB
Language selection
After the configuration process has been started:
Î
the inverter scans the network connected by the EIA485-Bus for
other inverters.
Î
all inverters connected to the network are blocked.
EIA485 bus
As long as the network scan (Scanning Network) is still in process,
the display shows the following screen:
When the network scan is completed, the display shows the number
of detected bus participants. In case of a single inverter, the display
shows 01.
Key
Function
ST
Select language.
OK
Accept selected language.