![Pittway NOTIFIER AA-100 Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/pittway/notifier-aa-100/notifier-aa-100_manual_1560284019.webp)
The MPS-24B/MPS-24BE Main Power Supply
7KH 3RZHU 6XSSOLHV
XP Series Transponder PN 15888:G 6/11/98
15
)LJXUH ,QVWDOOLQJ DQ 2SWLRQDO 0DLQ 3RZHU 0HWHU
7KH036%036%(0DLQ3RZHU6XSSO\
The MPS-24B/MPS-24BE Main Power Supply is capable of powering the
XP Transponder continuously during an alarm and non-alarm conditions. A total of
750 mA @ 24 VDC filtered is available from the MPS-24B/MPS-24BE Main Power
Supply for operating the system during standby conditions.
1RWH )LJXUH LOOXVWUDWHV FRQQHFWLRQV IRU SULPDU\ DQG VHFRQGDU\ SRZHU WR WKH 036%036%(
0DLQ 3RZHU 6XSSO\
&RQQHFWLQJWKH3ULPDU\3RZHU6RXUFH
The MPS-24B requires 120 VAC, 50/60 Hz primary power and the MPS-24BE requires
220/240 VAC, 50/60 Hz primary power. With the circuit breaker at the main power
distribution panel turned off, remove the plastic insulating cover from TB1 on the MPS-
24B/MPS-24BE and connect the system primary power source. Connect the service
ground to TB1-2 on the MPS-24B/MPS-24BE. Connect Earth Ground from the power
supply to the cabinet with a Chassis Ground cable (71073) to TB1-2. Connect the AC
neutral line to TB1-3 and the AC Hot line to TB1-4 on the MPS-24B/MPS-24BE. Do
not route AC wiring in the same conduit as other XP Transponder circuits. After
completion of these connections, reinstall the plastic insulating cover over the terminal
block. Leave the main power breaker off until the entire XP Transponder is complete.
&RQQHFWLQJWKH6HFRQGDU\3RZHU6RXUFH9'&
Secondary power (batteries) is required to support the XP Transponder during loss of
primary power. These batteries reside in the cabinet or in a separate NR45-24/NR45-
24E Remote Battery Charger cabinet. Connect the Battery Positive Cable to TB3-1 (+)
and the Battery Negative Cable TB3-2 (-) on the MPS-24B/MPS-24BE.
1RWH 'R QRW FRQQHFW WKH %DWWHU\ ,QWHUFRQQHFW &DEOH DW WKLV WLPH 7KLV FRQQHFWLRQ ZLOO EH PDGH MXVW
DIWHU LQLWLDO SULPDU\ V\VWHP SRZHUXS
Step 1
Remove the two screws in the bottom left-
hand corner of the MPS-24A/MPS-24AE
Step 2
Feed long screws through the MPM-2 and
standoffs, as shown at right. Fasten screws
in holes that were opened in Step 1.
Step 3
Complete the installation of the MPM-2
by plugging the female connector on the
meter cable into Plug P7 on the MPS-24A/
MPS-24AE