8.4.2 - COMMISSIONING OF THE ZERO VERSION REGULATOR
For commissioning the Zero (C) version regulator, proceed as shown in Tab. 8.52.:
Step
Operation
1
Partially open the downstream vent tap when present.
2
Slowly open upstream shutoff devices (e.g., solenoid valves, OPSO block valve, etc.).
3
Wait for the downstream pressure to stabilize at the spring setting P2 indicated on the plate.
Refer to Section 2.8 "Identification plates applied" et seq. for the values on the identification
plate.
4
Proceed as indicated in Section 7.5.2 “Zero version adjustments”.
5
Close the vent tap.
Tab. 8.52.
GAS
A
B
C
D
Fig. 8.27. Commissioning (Zero version)