L
Line mains supply
N
Neutral mains supply
E
Earth ground
Test 2: Leakage Current Test with Mains Voltage Applied (Sink) for Intraoperative Transducers
Key to Test 2 Diagram
C
Stray capacitance from the ultrasound system power wiring to the system
grounded metal chassis (1 to 3 MΩ reactance)
Z
Impedance between the metal parts of the transducer and a test electrode placed
in the bucket of saline solution (about 850 kΩ with an intact outer insulating layer,
500 Ω with a hole in the layer)
A
Microammeter to measure leakage current from a line supply to the transducer
and back to earth ground through electrode Z and the equipment chassis
e
Line power source, either 110 Vac or 220 Vac
Leakage Current Testing for Intraoperative Transducers
Intraoperative Transducers
EPIQ 7 User Manual 4535 617 25341
195
Содержание epiq 7
Страница 4: ...4 EPIQ 7 User Manual 4535 617 25341 ...
Страница 26: ...Read This First Recycling Reuse and Disposal 26 EPIQ 7 User Manual 4535 617 25341 ...
Страница 94: ...DVD RW Drive System Overview System Components 94 EPIQ 7 User Manual 4535 617 25341 ...
Страница 100: ...Brake Steering Lock Pedal System Overview System Components 100 EPIQ 7 User Manual 4535 617 25341 ...
Страница 154: ...Customizing the System Custom Procedures 154 EPIQ 7 User Manual 4535 617 25341 ...
Страница 172: ...Performing an Exam Ending an Exam 172 EPIQ 7 User Manual 4535 617 25341 ...
Страница 198: ...Intraoperative Transducers Leakage Current Testing for Intraoperative Transducers 198 EPIQ 7 User Manual 4535 617 25341 ...
Страница 244: ...Endocavity Transducers Biopsy with Endocavity Transducers 244 EPIQ 7 User Manual 4535 617 25341 ...
Страница 298: ...System Maintenance For Assistance 298 EPIQ 7 User Manual 4535 617 25341 ...