80 . Spotlight 150 User's Guide
Fitting a Crystal Assembly to the ATR Objective
Manual ATR Objective
1.
Remove the ATR crystal holder, as described on page 79.
2.
Place the crystal holder on a bench, with the crystal upwards.
3.
While holding the crystal assembly in place, unscrew the knurled height-adjusting nut.
The crystal assembly is under spring pressure. If you do not hold the assembly in place,
the spring may be lost.
4.
Remove the crystal assembly.
Leave the spring in the ATR crystal holder.
5.
Place the new crystal assembly into the ATR crystal holder and refit the height-adjusting
nut.
Take care not to damage the crystal.
6.
Refit the ATR crystal holder to the microscope as described on page 73.
7.
Align and adjust the ATR crystal holder, as described on page 77.
Figure 37 The Manual ATR Crystal Assembly
Automated ATR Objective
1.
Remove the ATR crystal holder, as described on page 79.
2.
Place the crystal holder on a bench, with the crystal pointing upwards and the motor
pointing away from you.
3.
Unscrew the knurled height-adjustment nut.
4.
Pull the crystal assembly out of the holder.
5.
Hold the new crystal assembly with the thin alignment groove facing you (Figure 38).
Содержание Spotlight 150
Страница 1: ...Spotlight 150 User s Guide MOLECULAR SPECTROSCOPY ...
Страница 5: ...Introduction ...
Страница 11: ...Warnings and Safety Information ...
Страница 23: ...Overview of the Spotlight 150 ...
Страница 32: ...32 Spotlight 150 User s Guide ...
Страница 33: ...Getting Ready to Use the Spotlight 150 ...
Страница 45: ...Preparing Samples ...
Страница 58: ...58 Spotlight 150 User s Guide ...
Страница 59: ...Techniques for Collecting Spectra ...
Страница 94: ...Maintenance ...
Страница 102: ...Appendices ...