Techniques for Collecting Spectra . 63
The purge system consists of:
•
The gas inlet connector on the metal plate at the rear of the microscope and the
connector at the rear of the spectrometer;
•
The purge coupling molding connecting the spectrometer to the microscope;
•
The lower purge gaiter under the lower cassegrain.
When all of these parts are in place, the gas entering through the inlet displaces air from the
path of the infrared beam.
Purging the system
1.
Make sure that all parts of the purge system, as listed above, are in place.
2.
Set up the microscope.
See
Getting Ready to Use the Spotlight 150
starting on page 33.
3.
Place the sample in position.
4.
Purge the microscope and spectrometer for 15 to 20 minutes at a rate of 10 l min
−1
.
5.
Collect the background spectrum and the spectrum of the sample.
Changing the sample
If you have changed a sample, any air that has entered the system must be flushed out.
Содержание Spotlight 150
Страница 1: ...Spotlight 150 User s Guide MOLECULAR SPECTROSCOPY ...
Страница 5: ...Introduction ...
Страница 11: ...Warnings and Safety Information ...
Страница 23: ...Overview of the Spotlight 150 ...
Страница 32: ...32 Spotlight 150 User s Guide ...
Страница 33: ...Getting Ready to Use the Spotlight 150 ...
Страница 45: ...Preparing Samples ...
Страница 58: ...58 Spotlight 150 User s Guide ...
Страница 59: ...Techniques for Collecting Spectra ...
Страница 94: ...Maintenance ...
Страница 102: ...Appendices ...