VisuNet GXP
Mechanical Installation
2
01
9-
10
48
3.3.13
Panel Mount Installation
1.
2.
4.
3.
Note
To mount the new DPU, perform the above steps in reverse.
Warning!
Proper installation
It is the installer's responsibility to select a suitable location with sufficient strength to hold the
equipment. It is the installer's responsibility to select the proper screws based on the
installation conditions.
VisuNet GXP
System Installation
5. Remove the two brackets (1) and the 10 bolts at the top, sides, and bottom of the DPU (2).
Remove the carabiners (3) from their brackets, take out the 6 bracket screws (4), and
remove the carabiner brackets.