2
01
9-
10
17
VisuNet GXP
Mechanical Installation
3.3
System Installation
3.3.1
General Installation Information
Observe the following requirements when installing the system components.
•
The equipment must be installed by competent personnel in accordance with the
instructions. National laws and regulations must be observed.
•
The building installation must provide a 20 A overcurrent protection.
•
The installer must make a readily accessible disconnect device available.
•
The safety of any system incorporating the PSU is the responsibility of the assembler of
the system.
Included with Delivery
•
Pre-assembled VisuNet PC- or RM-GXP panel (pre-mounted into AG-XX00 housing
when "H1" option is selected)
•
2 x protective tubes
•
Screws for housing
Items Ordered Separately
•
Pedestal that is compatible with AG-XX00 housing (StandardLine or BasicLine pedestal)
•
Optional EXTA2-* keyboard
Warning!
Risk of injury
Lifting the device on your own may lead to injury.
Do not attempt to lift the device on your own. Use a crane or have another person help you.
Warning!
Proper installation on the floor
It is the installer's responsibility to select a suitable location with sufficient strength to hold the
equipment. It is the installer's responsibility to select the proper screws based on the
installation conditions.
VisuNet GXP
System Installation